Laserfiche WebLink
approval the security may be reduced from time to time by ninety percent (90%) of the financial obligations <br />that have been satisfied. Ten percent (10%) of the amounts certified by the Developer's engineer, and <br />approved by City's Engineer, shall be retained as security until all Improvements have been completed, all <br />financial obligations to the City satisfied, the required "as constructed" Plans have been received by the City, <br />and the public Improvements are accepted by the City Council. The City standard specifications for utilities <br />and street construction outline procedures for security reductions. <br />25. SUMMARY OF CASH REQUIREMENTS AND FEES. The following is a <br />summary of the cash requirements and fees due under this Contract, which must be paid in cash at <br />the time of final plat approval: <br />Park Dedication Fee $27,750.00 <br />Storm Water and Drainage Trunk Fee 46,080.00 <br />Final Plat Fee $700.00 <br />Total Cash Requirements & Fees 74 0.00 <br />26. WARRANTY. The Developer warrants all Improvements against poor material and faulty <br />workmanship. The warranty period for streets is one year. The warranty period for underground utilities is <br />two years and shall commence following completion and acceptance by the City Council. The one year <br />warranty period on streets shall commence after the final wear course has been installed and accepted by the <br />City Council as documented in official City minutes. The Developer shall post a maintenance bond, letter of <br />credit or cash deposit (the "Maintenance Security") in an amount reasonably determined by the City Engineer. <br />The City Engineer shall examine the condition of the Improvements when determining the amount of the <br />Maintenance Security. The City shall retain ten percent (10%) of the security until the Maintenance Security <br />is furnished the City or until the warranty period expires, whichever first occurs. The retainage may be used <br />to pay for warranty work. The City standard specifications for utilities and street construction identify the <br />procedures for final acceptance of streets and utilities. <br />27. RESPONSIBILITY FOR COSTS. <br />190443v2 11 <br />