Laserfiche WebLink
2017 Projects <br />Category <br />Project <br />Detail / Scope <br />Justification <br />Estimated Cost <br />Funding <br />Lead <br />Streets <br />$ 271,373 <br />Source <br />BMI <br />Fox Street (OCB-Willow) <br />Reconstruct the roadway in the current footprint, creating an even width 24'). Construct a <br />The pavement is in very poor condition (PCI 46) <br />Kelly Avenue Drainage Improvements <br />This project is a continuation of work started in 2015 to improve drainage in the Kelly <br />This project was not completed in 201 as the 2015 project ran was not completed until the <br />Streets <br />Phase 2 <br />Avenue area. During this phase of the project the City will replace 15" culvert under Kelly <br />end of 2016. <br />PMF <br />BMI <br />Storm Water <br />Northern Avenue Mill and Overlay <br />Avenue with double 15" culverts directly to wetland P2, and replace the 8" tile outlets with <br />The pavement is in poor condition (PCI 61) <br />$ 75,000 <br />Storm Fund <br />PW <br />Streets <br />12" for wetlands P7 and P8. <br />$ 63,565 <br />PMF <br />BMI <br />Storm Water Inspection and <br />Each year the City inspects and cleans 1/5 of the storm sewer system. The focus area for <br />The inspections then drive future repair activities for the city. <br />Streets <br />maintenance. <br />2017 is District 4. <br />$ 33,156 <br />PMF <br />BMI <br />Storm Water <br />Minnetonka Highlands Mill and <br />Mill and overlay 1100 feet of pavement <br />The pavement is in poor condition (PCI 62) <br />Storm GF <br />PW <br />MS4 / SWPP Compliance <br />Quarterly inspect all stockpiles, <br />Comply with the City's MS4 permit several actions are required in 2016 to inclE <br />Streets <br />Bi Annually Publish Stormwater education articles, <br />$ 64,361 <br />PMF <br />BMI <br />Storm Water <br />2017 Seal Coating <br />Annually Inspect structural Stormwater BMPs, <br />Preventive maintenance <br />Storm GF <br />PW <br />Streets <br />Annually conduct public meeting annually and <br />$ 108,122 <br />PMF <br />PW <br />Fox Street and OCB Road Water <br />This project would see improvements to the stormwater system in the vicinity of Fox Street <br />Though CIP-4 is primarily a flood control and conveyance project, it is assumed <br />quality Improvement (SWMP 4) <br />and Old Crystal Bay road. Ideally these improvements would be incorporated into the Fox <br />water <br />Storm Water <br />Sheet Road Reconstruction project. <br />quality treatment can be retrofit to this area. Approximately 19 acres of rural res <br />use <br />92,4-,'' <br />Storm Fund <br />BMI <br />Stormwater Pond Assessment <br />This project will delineate / verify the delineations of the City's sub -watersheds as they <br />Per the City's MS4 permit plan <br />relate to the Cities storm water ponds in the French Lake (FR), Lake Classen (LC), <br />Storm Water <br />Maxwell Bay (MB), and Stubbs Bay (SB) Subwatersheds <br />Storm Fund <br />BMI <br />Misc Storm Water improvements <br />Un programmed major storm water repairs and improvements. <br />Storm Water <br />$ 76,500 <br />Storm Fund <br />BMI <br />Crack Sealing <br />Crack Seal <br />Annual preventive maintenance <br />Streets <br />$ 15,000 <br />Streets <br />PW <br />Operating <br />Striping <br />Restripe selected Streets <br />Annual Street Maintenance to ensure flog lines, center lines and other pavement marking <br />remain visible to users. <br />Streets <br />Streets <br />$ 10,000 <br />Operating <br />PW <br />Fox Street Reconstruction (Willow to <br />This project will consist of the reconstruction the roadway in the current footprint, creating <br />The road is falling apart. <br />Brown) (MSA) <br />an even width (24'); Construction of a pavement section that includes geotextile fabric, 10- <br />Streets <br />inches of aggregate base and 5 -inches of bituminous pavement; select subgrade <br />$ 643,545 <br />MSA Funding <br />BMI <br />corrections, and the replacement / improvement of the associated Stormwater system <br />Old Crystal Bay Turn Lane <br />Partner with Orono Public Schools to construct a tum lane from the southbound lane in to <br />Agreed to by council in resolution. <br />Construction <br />the norther high school entrance. <br />Streets <br />$ 25,000 <br />PMF <br />BMI <br />Council Decision on the following projects will be defered until March 2017. <br />As Of: 12/6/2016 <br />Forest Arm Lane Reconstruction <br />Reconstruction of 1700 ft of roadway. <br />The pavement is in very poor condition (PCI 44) <br />Streets <br />$ 271,373 <br />PMF <br />BMI <br />Fox Street (OCB-Willow) <br />Reconstruct the roadway in the current footprint, creating an even width 24'). Construct a <br />The pavement is in very poor condition (PCI 46) <br />Reconstruction <br />pavement section that includes geotextile fabric, 10 -inches of aggregate base and 5 -inches <br />Streets <br />of bituminous pavement. <br />PMF <br />BMI <br />Northern Avenue Mill and Overlay <br />Mill and overlay 1250 feet of pavement <br />The pavement is in poor condition (PCI 61) <br />Streets <br />$ 63,565 <br />PMF <br />BMI <br />Minnetonka Avenue Mill and Overlay <br />Mill and overlay 850 feet of pavement <br />The pavement is in poor condition (PCI 62) <br />Streets <br />$ 33,156 <br />PMF <br />BMI <br />Minnetonka Highlands Mill and <br />Mill and overlay 1100 feet of pavement <br />The pavement is in poor condition (PCI 62) <br />Overlay <br />Streets <br />$ 64,361 <br />PMF <br />BMI <br />2017 Seal Coating <br />Chip seal 13,050 feet of road. <br />Preventive maintenance <br />Streets <br />$ 108,122 <br />PMF <br />PW <br />Forest Arms Main Replacement w/ <br />Replace approximately 1680 feet of gravity sewer main. <br />Sewer main is from 1970. If road is replaced, it is an ideal time to replace the seer and <br />Road Reconstruction <br />other utilities at the same time. <br />Sewer <br />92,4-,'' <br />Sewer Fund <br />PW <br />As Of: 12/6/2016 <br />