My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-28-2016 Council Packet
Orono
>
City Council
>
2016
>
11-28-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 3:02:05 PM
Creation date
11/28/2017 3:51:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
25. SUMMARY OF CASH REQUIREMENTS AND FEES. The following is a <br />summary of the cash requirements and fees due under this Contract, which must be paid in cash at <br />the time of final plat approval: <br />Park Dedication Fee $27,750.00 <br />Storm Water and Drainage Trunk Fee 46,080.00 <br />Final Plat Fee 700.00 <br />Total Cash Requirements & Fees 74 530.00 <br />26. WARRANTY. The Developer warrants all Improvements against poor material and <br />faulty workmanship. The warranty period for streets is one year. The warranty period for underground <br />utilities is two years and shall commence following completion and acceptance by the City Council. The <br />one year warranty period on streets shall commence after the final wear course has been installed and <br />accepted by the City Council as documented in official City minutes. The Developer shall post a <br />maintenance bond, letter of credit or cash deposit (the "Maintenance Security") in an amount reasonably <br />determined by the City Engineer. The City Engineer shall examine the condition of the Improvements when <br />determining the amount of the Maintenance Security. The City shall retain ten percent (10%) of the security <br />until the Maintenance Security is furnished the City or until the warranty period expires, whichever first <br />occurs. The retainage may be used to pay for warranty work. The City standard specifications for utilities <br />and street construction identify the procedures for final acceptance of streets and utilities. <br />27. RESPONSIBILITY FOR COSTS. <br />A. Except as otherwise specified herein, the Developer shall pay all costs incurred by <br />it or the City in conjunction with the development of the Land, including but not limited to Hennepin <br />County Environmental Services and Minnehaha Creek Watershed District charges, legal, planning, <br />engineering and inspection expenses incurred in connection with approval and acceptance of the Plat, the <br />preparation of this Contract, review of construction plans and documents, and all costs and expenses <br />incurred by the City in monitoring and inspecting development of the Land. <br />188905v1 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.