My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-28-2016 Council Packet
Orono
>
City Council
>
2016
>
11-28-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 3:02:05 PM
Creation date
11/28/2017 3:51:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Plan F — SWPPP Plan <br />Plan G — Conservation Design Report and Master Plan <br />Plan H — Tree Preservation Plan <br />Plan I — Stormwater Maintenance Plan <br />S. IMPROVEMENTS. The Developer shall install and pay for the following as required <br />to be built in accordance with the approved Plans (the "Improvements"): <br />A. Site Grading, Ponding, and Erosion Control <br />B. Setting of Iron Monuments <br />C. Surveying and Staking <br />D. Private Roadway <br />E. Storm Sewers and Stormwater Management Facilities & Ponds <br />F. Development Landscaping <br />G. Underground Utilities <br />The Improvements shall be installed in accordance with the City subdivision ordinance; City standard <br />specifications for utilities and street construction; and any other ordinances including those concerning <br />erosion and drainage and any prohibiting grading, construction activity, and the use of power equipment. <br />The Developer shall submit plans and specifications which have been prepared by a competent registered <br />professional engineer to the City for approval by the City Engineer. The Developer shall instruct its <br />engineer to provide adequate field inspection personnel to assure an acceptable level of quality control. In <br />addition, the City may, at the City's discretion and at the Developer's expense, have one or more City <br />inspectors and a soil engineer inspect the work as the City may reasonably determine. The Developer, its <br />contractors and subcontractors, shall follow all instructions received from the City's inspectors. The <br />Developer's engineer shall provide for on-site project management. The Developer's engineer is responsible <br />for design changes and contract administration between the Developer and the Developer's contractor. The <br />Developer or its engineer shall schedule a pre -construction meeting at a mutually agreeable time at the City <br />Council chambers with all parties concerned, including the City staff, to review the program for the <br />construction work. Within thirty (30) days after the completion of the Improvements and before the <br />188905v1 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.