My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-28-2016 Council Packet
Orono
>
City Council
>
2016
>
11-28-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 3:02:05 PM
Creation date
11/28/2017 3:51:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2017 Projects <br />Color code Funding available through Sufficient funding not <br />proposed budget or identified but may be available <br />appropriate enterprise fund from positive fund balances <br />As Of: 11/22/2016 <br />Funding <br />Category <br />Project <br />Detail / Scope <br />Justification Estimated Cost <br />Source <br />Lead <br />Fox Street Reconstruction (Willow to <br />This project will consist of the reconstruction the roadway in the current footprint, creating <br />The road is falling apart. <br />Brown) (MSA) <br />an even width (24'); Construction of a pavement section that includes geotextile fabric, 10 <br />Streets <br />inches of aggregate base and 5 -inches of bituminous pavement; select subgrade <br />MSA Funding <br />BMI <br />corrections, and the replacement / improvement of the associated Stormwater system. <br />Old Crystal Bay Turn Lane <br />Partner with Orono Public Schools to construct a turn lane from the southbound lane in to <br />Agreed to by council in resolution. <br />Construction <br />the northern high school entrance. <br />Streets <br />PMF <br />BMI <br />Forest Arm Lane Reconstruction <br />Reconstruction of 1700 ft of roadway. <br />The pavement is in very poor condition (PCI 44) <br />Streets <br />PMF <br />BMI <br />Fox Street (OCB-Willow) <br />Reconstruct the roadway in the current footprint, creating an even width 24'). Construct a <br />The pavement is in very poor condition (PCI 46) <br />Reconstruction <br />pavement section that includes geotextile fabric, 10 -inches of aggregate base and 5 -inches <br />Streets <br />of bituminous pavement. <br />PMF <br />BMI <br />Northern Avenue Mill and Overlay <br />Mill and overlay 1250 feet of pavement <br />The pavement is in poor condition (PCI 61) <br />Streets <br />PMF <br />BMI <br />Minnetonka Avenue Mill and Overlay <br />Mill and overlay 850 feet of pavement <br />The pavement is in poor condition (PCI 62) <br />Streets <br />PMF <br />BMI <br />Minnetonka Highlands Mill and <br />Mill and overlay 1100 feet of pavement <br />The pavement is in poor condition (PCI 62) <br />Overlay <br />Streets <br />PMF <br />BMI <br />2017 Seal Coating <br />Chip seal 13,050 feet of road. <br />Preventive maintenance <br />Streets <br />PMF <br />PW <br />Crack Sealing <br />Crack Seal <br />Annual preventive maintenance <br />Streets <br />Streets <br />PW <br />Operating <br />Striping <br />Restripc selected Streets <br />Annual Street Maintenance to ensure flog lines, center lines and other pavement marking <br />remain visible to users.$ <br />Streets <br />Streets <br />PW <br />Operating <br />Color code Funding available through Sufficient funding not <br />proposed budget or identified but may be available <br />appropriate enterprise fund from positive fund balances <br />As Of: 11/22/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.