My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-2016 Council Packet
Orono
>
City Council
>
2016
>
11-14-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:45:36 PM
Creation date
11/28/2017 3:30:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />DATE: November 14a`, 2016 <br />ITEM NO: 8 <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam Edwards Public Works Director/ <br />Title Public Works Director/City Engineer City Engineer's Report <br />Item Description: Baldur Park Road Pay Request #3- Final <br />List of Exhibits <br />A- Pay Request <br />B- Drainage Work Invoice <br />1. Purpose. The purpose of this action item is to gain Council approval of a design option for the Baldur <br />Park Reconstruction Project. <br />2. Background. Baldur Park Road is a 1,000 ft. long bituminous low volume residential road. In July <br />2015 the Council awarded road project to GMH. <br />3. Cost. The construction cost brake down for the nroiect is in the table below <br />Who Work <br />Approved <br />Cost <br />This Pay Total to <br />Request Date <br />Bolton &Menk, Inc Design and Bid Engineering <br />$ 23,850 <br />$ 23,850 <br />GMH Road Construction <br />$ 143,523 <br />$ 127,060 <br />Pride Construction Drainage <br />$ 14,980 $ 14,980 <br />AET, Inc Geotechnical Engineering <br />$ 3,300 <br />$ 3,300 <br />Bolton &Meek, Inc I Construction Oversight <br />$ 14,750 <br />$ 14,750 <br />TOTAL <br />$185,423 <br />$ 180,640 <br />4. Funding. The project is funded with a combination of the funding sources below: Pavement <br />Management Fund, FEMA Funding and the Storm Water Fund. Funds for these pay requests will come <br />from the following: <br />Fund <br />Total <br />Est. End of Year <br />Fund Balance <br />Pavement Management Fund <br />$ 98,028 <br />$ 332,896 <br />FEMA <br />$ 59,223 <br />--------- <br />Storm Water Fund <br />$ 23,389 <br />$ 1,413,358 <br />Total <br />$180,640 <br />5. Status. GMH completed the majority of the road work in the 2015 construction season. GMH <br />completed punch list items for the road construction and requests the balance of the retainage be paid in <br />the amount of $1,443.85 in 2016. Pride Construction completed drainage work in 2016 for $14,597. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve Pay Request No. 3 to GMH in the amount of $ $1,443.85 and Pride Construction <br />$14,980.00 for the Baldur Park Road Rehabilitation project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.