Laserfiche WebLink
land values in the city, the eight percent park dedication requirement could result in park <br />dedication requirements that are either significantly greater than or significantly less than the <br />amount which is roughly proportional to the impact of the proposed development on the city's <br />park system. Periodically, therefore, the city will establish both a maximum and minimum park <br />dedication amount per dwelling unit based on an updated projection of the cost of the city's park <br />system and the proportionate share of this projected cost to be borne by new dwelling units in <br />the city. 8% of the value of the land is lower than the minimum, so $3,250 per residential unit <br />will be used. Therefore the park dedication due at the time of Final Plat is $22,750.00. However, <br />as part of the original plat for the subject property, Leach Addition, (1978), three lots were platted, <br />and park dedication paid. Park dedication for four lots are due with the Project. The adjusted <br />park dedication is $3,250.00 per lot x 4 lots = $13,000.00 <br />22. SEWER AND WATER CONNECTION CHARGE. Water connection charges <br />paid as part of the 1970 LW -1 project were 7.5 residential equivalent units. No <br />additional water connection charges have been identified. Assessed charges as <br />part of the 1984 Lift Station 7 and forcemain upgrade are owed as part of this <br />project and amount to $2,550.00 per unit ($610.00 + $1940.00). Based on 2016 <br />fee schedule, the fees are: <br />$0.00 for municipal water and <br />$2,550.00 per lot x 7 lots = $17,850.00 <br />23. LANDSCAPING. All landscaping shall be installed in accordance with Plan F. <br />24. SPECIAL PROVISIONS. The following special provisions shall apply to <br />development of the Land: <br />10 <br />1895630 <br />