Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br />Date: November 14, 2016 <br />Item No.: 14 <br />Department Approval: Administrator Approval: Agenda Section: <br />Name: Jeremy Barnhart Y"_4 Planning Dept. <br />Title: Community Development Director <br />Item Description: #16-3868, Charles Cudd, LLC o/b/o DDK, LLC, 2525, 2535, and 2545 <br />Shadywood Road - Final Plat <br />On September 12, 2016 the City Council adopted Resolution No. 6668 granting preliminary <br />approval for a 7 -lot residential plat of the properties at 2525, 2535, and 2545 Shadywood Road, <br />to be known as Shadywood Villas. The developer, Charles Cudd, LLC, is nearing approval of the <br />final plat. The remaining item on the final plat is the vacation of drainage and utility easements <br />held over from the original Plat of the property, Leach Addition. The Planning Commission will <br />hold a public hearing on November 21, and the Council will see the vacation request at its <br />meeting on November 28th. Staff views the vacation request as a housekeeping item. The final <br />plat is consistent with the approved preliminary plat. <br />The developer seeks Council direction on three questions associated with the Development <br />Agreement, draft attached. <br />Question 1. Upon closer inspection of the proposed homes, the Floor Area Ratio (FAR) for two <br />lots exceeds limits previously imposed. The floor area of the homes is 4893 sq feet, and includes <br />the entire basement, main floor, sun porch, and garage. The resulting floor area for Lot 3 is 0.55 <br />and for lot 4 is 0.63. The homes have not changed from the original submitted. The <br />development agreement establishes the appropriate limits for these lots to permit the home <br />proposed. <br />Question 2. The developer desires to start construction on the homes before the 1 st lift of asphalt <br />is applied to the new internal street. The internal street is a public street. Allowing home <br />construction before the 1St lift gives the builder a 7 month head start, as the 1St lift likely won't be <br />applied until next May, with a foundation potentially being dug in June -July. Historically, <br />Orono has required at least the 1St lift for many reasons, including emergency access and <br />engineering/ construction management: <br />Engineering <br />• Fall conditions are typically wet and soils have no chance to dry up because of the <br />cool weather and short days. Because of this, it is very common that the <br />subgrade cannot pass a roll test in the last fall. The proposed solution is typically <br />to increase the depth of the pavement structure (i.e. add sand) to bridge over the <br />soft wet soils but it does not address the issue completely and drainage of the <br />pavement section can be an issue. <br />• When the aggregate base is proposed for a traveled surface to allow home <br />construction to begin there are several issues. For one thing, all components of <br />the pavement structure are needed to provide the intended strength for the <br />road. A gravel base does not provide the same strength as a complete road, <br />