My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-2016 Council Packet
Orono
>
City Council
>
2016
>
11-14-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:45:36 PM
Creation date
11/28/2017 3:30:10 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />DATE: November 14th, 2016 <br />ITEM NO: 10 <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam Edwards Y"-4 Public Works Director/ <br />Title Public Works Director/City Engineer City Engineer's Report <br />Item Description: CSAR 112 Trail Extension Option <br />Exhibits: <br />A. Project Area Map. <br />B. Council Minutes Excerpt, September 26", 2016 <br />C. Cost Estimate. <br />D. Comprehensive Trail System Map. <br />E. Excerpt from Hennepin County 2014 Bicycle Transportation Plan. <br />1. Purpose. The purpose of this item is to get a Council approval for trail extension from Old Long <br />Lake Road to the Luce Line Trail to be included in the CSAH 112 (Wayzata Blvd) Turn Back Phase 2 <br />Proj ect. <br />2. Summary. Hennepin County intends to improve CSAH 112 from Highway 12 to 6th Avenue as a <br />joint effort with Long Lake and Orono. The overall project is broken into three phases. Currently we are <br />in the final design portion of phase two which includes the stretch of CSAH 112 from Wolf Pointe Trail <br />to the Highway 12 ramps. As part of the preliminary design a trail was planned from the Orono School <br />campus to Old Long Lake Road (Red line on map below). During the Phase two design the City and <br />County are considering an extension of the trail along the north side of CSAH 112 from Long Lake Road <br />to the Luce Line (Blue line on the map below) (Exhibit A&B). The estimated cost of the extension would <br />be $220,000 to be cost shared with Hennepin County. The Orono Cost would be $110,000 (Exhibit Q. <br />
The URL can be used to link to this page
Your browser does not support the video tag.