Laserfiche WebLink
PARTIAL PAY ESTIMATE NO. 2- FINAL <br />KELLY AVENUE STORM SEWER OUTFALL <br />CITY OF ORONO, MINNESOTA <br />BMI PROJECT NO. C13.110197 <br />WORK COMPLETED THROUGH AUGUST 31, 2016 <br />ITEM <br />NO. <br />ORIGINAL <br />PLAN <br />QTY. <br />UNIT <br />OF <br />MEASURE <br />UNIT <br />PRICE <br />BID <br />AMOUNT <br />PREVIOUS <br />PAY APPLICATIONS <br />QUANTITY AMOUNT <br />TOTAL COMPLETED <br />TO DATE <br />QUANTITY AMOUNT <br />1 <br />MOBILIZATION & TRAFFIC CONTROL <br />1 <br />LUMP SUM <br />$5,000.00 <br />$5,000.00 <br />1.0 <br />$5,000.00 <br />1.0 <br />$5,000.00 <br />2 <br />SAWCUT PAVEMENT FULL DEPTH <br />52 <br />LIN FT <br />$10.00 <br />$520.00 <br />52.0 <br />$520.00 <br />52.0 <br />$520.00 <br />3 <br />REMOVE DRAINAGE STRUCTURE <br />1 <br />EACH <br />$500.00 <br />$500.00 <br />1.0 <br />$500.00 <br />1.0 <br />$500.00 <br />4 1 <br />REMOVE BITUMINOUS PAVEMENT <br />52 <br />SQ YD <br />$7.00 <br />$364.00 <br />64.0 <br />$448.00 <br />64.0 <br />$448.00 <br />5 <br />REMOVE TREE <br />13 <br />EACH <br />$575.00 <br />$7,475.00 <br />15.0 <br />$8,625.00 <br />15.0 <br />$8,625.00 <br />6 <br />EXPORT COMMON MATERIAL <br />1 <br />LUMP SUM <br />$4,400.00 <br />$4,400.00 <br />1.0 <br />$4,400.00 <br />1.0 <br />$4,400.00 <br />7 <br />COMMON EXCAVATION <br />1 <br />LUMP SUM <br />$4,650.00 <br />$4,650.00 <br />1.0 <br />$4,650.00 <br />1.0 <br />$4,650.00 <br />8 <br />SUBGRADE PREPARATION P <br />52 <br />SQ YD <br />$5.00 <br />$260.00 <br />64.0 <br />$320.00 <br />64.0 <br />$320.00 <br />9 <br />AGGREGATE BASE CLASS 5 - 100% CRUSHED, 8" THICK P <br />22 <br />TON <br />$35.00 <br />$770.00 <br />33.2 <br />$1,162.35 <br />33.2 <br />$1,162.35 <br />10 <br />TYPE SP 12.5 NON -WEARING COURSE MIX 2,B 2.0" THICK P <br />6 <br />TON <br />$385.00 <br />$2,310.00 <br />20.0 <br />$7,700.00 <br />20.0 <br />$7,700.00 <br />11 1 <br />ITYPE SP 9.5 WEARING COURSE MIX 2,B 1.5" THICK P <br />4 <br />TON <br />$275.00 <br />$1,100.00 <br />10.0 <br />$2,750.00 <br />10.0 <br />$2,750.00 <br />12 <br />CONSTRUCT DRAINAGE STRUCTURE - DESIGN F <br />6 <br />LIN FT <br />$500.00 <br />$3,000.00 <br />6.0 <br />$3,000.00 <br />6.0 <br />$3,000.00 <br />13 <br />CONSTRUCT DRAINAGE STRUCTURE - DESIGN G <br />2 <br />LIN FT <br />$650.00 <br />$1,300.00 <br />2.0 <br />$1,300.00 <br />2.0 <br />$1,300.00 <br />14 <br />18" RC PIPE SEWER DESIGN 3006 CLASS V <br />200 <br />LIN FT <br />$53.00 <br />$10,600.00 <br />192.0 <br />$10,176.00 <br />192.0 <br />$10,176.00 <br />15 <br />18" RC APRON WITH TRASH GUARD <br />2 <br />EACH <br />$1,110.00 <br />$2,220.00 <br />2.0 <br />$2,220.00 <br />2.0 <br />$2,220.00 <br />16 <br />COBBLED RIVER ROCK, 6" - 9" DIAMETER <br />13 <br />CY YD <br />$110.00 <br />$1,430.00 <br />14.0 <br />$1,540.00 <br />14.0 <br />$1,540.00 <br />17 <br />CONNECT TO EXISTING STORM PIPE <br />1 <br />EACH <br />$595.00 <br />$595.00 <br />1.0 <br />$595.00 <br />1.0 <br />$595.00 <br />18 1 <br />ICASTING ASSEMBLY STORM <br />2 <br />EACH <br />$530.00 <br />$1,060.00 <br />2.0 <br />$1,060.00 <br />2.0 <br />$1,060.00 <br />19 1 <br />1EXTERNAL CHIMNEY SEAL <br />2 <br />EACH <br />$250.00 <br />$500.00 <br />2.0 <br />$500.00 <br />2.0 <br />$500.00 <br />20 <br />WATER MAIN OFFSET <br />1 <br />LUMP SUM <br />$6,245.00 <br />$6,245.00 <br />1.0 <br />$6,245.00 <br />1.0 <br />$6,245.00 <br />21 <br />COMMON TOPSOIL BORROW <br />65 <br />CU YD <br />$40.00 <br />$2,600.00 <br />22 <br />EROSION CONTROL BLANKET, CAT. 3 WITH STATE SEED MIX 36-211 <br />89 <br />SQ YD <br />$5.00 <br />$445.00 <br />120.0 <br />$600.00 <br />195.0 <br />$975.00 <br />23 <br />SOD, TYPE LAWN <br />302 <br />SQ YD <br />$12.00 <br />$3,624.00 <br />310.0 <br />$3,720.00 <br />24 <br />SILT FENCE, TYPE MS <br />15 <br />LIN FT <br />$10.00 <br />$150.00 <br />25.0 <br />$250.00 <br />25.0 <br />$250.00 <br />25 <br />SILT CURTAIN <br />20 <br />LIN FT <br />$30.00 <br />$600.00 <br />20.0 <br />$600.00 <br />20.0 <br />$600.00 <br />26 1 <br />ILANDSCAPNG ALLOWANCE <br />1 <br />ALLOWANCE <br />$8,000.00 <br />$8,000.00 <br />1.0 <br />$10,028.66 <br />EXTRA WORK <br />DOWNSPOUT LINE <br />1 <br />LS <br />$715.00 <br />$715.00 <br />1.0 <br />$715.00 <br />ROCK CHECKS <br />1 <br />LS <br />$502.50 <br />$502.50 <br />1.00 <br />$882.50 <br />TOTAL BASE BID: <br />$69,718.00 <br />$64,161.35 <br />$79,882.51 <br />H:\ORNO\C13110197\7_ Construction\E_Pay Applications\Pay Request No 2 - Final.xls <br />