Laserfiche WebLink
CUP Orono narrative 8-12-16 <br />Description and scope of work; <br />This application requests permission to convert an existing half -bath <br />to a full bath including tub and shower. This will permit the conversion <br />of the second floor of an existing Tack building into a on apartment. <br />The purpose of the apartment is to have a live-in caretaker to care for <br />our horses. It's important to have live-in help for these animals, espe- <br />cially when we travel out of town. Now that are retired we expect to <br />travel much more than in the past. In addition, family guests may stay <br />there for brief visits when we run out of space in the main house. <br />The existing half bath is approximately 10 x 15' The room will be fit- <br />ted out with a shower tub combination, the existing sink and stool will <br />be upgraded, cabinetry will be installed, painting and lighting will be <br />addressed.Appropriate building materials will be used. <br />Construction will occur during regular working hours. All work will be <br />will interior, therefore we do not anticipate any noise or unusual out- <br />door activity. No more than one or two workers are expected to be on- <br />site at any given time There is adequate off street parking around the <br />building, we do not expect any impact on traffic on Old Crystal Bay <br />Fid. <br />No mitigation will be required since there will be no negative impact; <br />visual, auditory or olfactory. <br />RECEIVED <br />AUG 15 2016 <br /># 3859 CITY OF ORONO <br />