My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2016 Council Packet
Orono
>
City Council
>
2016
>
10-10-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:06:44 PM
Creation date
11/28/2017 3:09:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Park Dedication Fee $ 16,650.00 <br />Storm Water and Drainage Trunk Fee 23,040.0 <br />Sewer Connection Charges (4 lots) 89,760.00 <br />Engineering, Oversight and Erosion Control Escrow <br />Final Plat Fee 700.00 <br />Total Cash Requirements & Fees S <br />27. WARRANTY. The Developer warrants all Improvements against poor material <br />and faulty workmanship. The warranty period for streets is one year. The warranty period for <br />underground utilities is two years and shall commence following completion and acceptance by <br />the City Council. The one year warranty period on streets shall commence after the final wear <br />course has been installed and accepted by the City Council as documented in official City <br />minutes. The Developer shall post a maintenance bond, letter of credit or cash deposit (the <br />"Maintenance Security") in an amount reasonably determined by the City Engineer. The City <br />Engineer shall examine the condition of the Improvements when determining the amount of the <br />Maintenance Security. The City shall retain ten percent (10%) of the security until the <br />Maintenance Security is furnished the City or until the warranty period expires, whichever first <br />occurs. The retainage may be used to pay for warranty work. The City standard specifications for <br />utilities and street construction identify the procedures for final acceptance of streets and utilities. <br />28. RESPONSIBILITY FOR COSTS. <br />A. Except as otherwise specified herein, the Developer shall pay all costs <br />incurred by it or the City in conjunction with the development of the Land, including but not <br />limited to Minnehaha Creek Watershed District charges, legal, planning, engineering and <br />inspection expenses incurred in connection with approval and acceptance of the Plat, the <br />preparation of this Contract, review of construction plans and documents, and all costs and <br />expenses incurred by the City in monitoring and inspecting development of the Project. <br />16 <br />Tanager Estates-vl-mpg-2/23/16 <br />16 <br />Tanager Estates-vl-mpg-2/23/16 <br />189339v3 <br />1893390 <br />
The URL can be used to link to this page
Your browser does not support the video tag.