My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2016 Council Packet
Orono
>
City Council
>
2016
>
10-10-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:06:44 PM
Creation date
11/28/2017 3:09:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
time is of the essence in controlling erosion. If the Developer does not comply with the erosion <br />control plan and schedule or supplementary instructions received from the City, the City may take <br />such action as it deems appropriate to control erosion. The City will endeavor to notify the <br />Developer in advance of any proposed action, but failure of the City to do so will not affect the <br />Developer's and City's rights or obligations hereunder. If the Developer does not reimburse the <br />City for any cost the City incurred for such work within ten (10) days, the City may draw down <br />the "security" to pay any costs. No development, utility or street construction will be allowed and <br />no building permits will be issued unless the Project is in full compliance with the approved <br />erosion control plan. <br />15. GRADING PLAN. The Project shall be graded in accordance with the approved <br />grading development and erosion control plan, Plan C. The plan shall conform to City of Orono <br />specifications. Within thirty (30) days after completion of the grading and before the City <br />approves individual building permits the Developer shall provide the City with an "as <br />constructed" grading plan certified by a registered land surveyor or engineer that all ponds, <br />swales, and ditches for public drainage have been constructed on public easements or land owned <br />by the City. Notwithstanding the foregoing, the City may issue building permits to the Developer, <br />prior to completion of all grading, provided the City Engineer has determined that adequate <br />erosion control measures are in place, and the City has received a final grading and road plan, <br />SWPPP, and plans for all improvements. The "as constructed" plan shall include field verified <br />elevations of the following: a) cross sections of ponds; b) location and elevations along all <br />swales, wetlands, wetland mitigation areas if any, and ditches, locations and dimensions of <br />borrow areas/stockpiles, and installed "conservation area" posts; and c) lot comer elevations, and <br />7 <br />Tanager Estates-vl-mpg-2123/16 <br />7 <br />Tanager Estates -v I -mpg-2/23/16 <br />1893390 <br />1893390 <br />
The URL can be used to link to this page
Your browser does not support the video tag.