My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2016 Council Packet
Orono
>
City Council
>
2016
>
10-10-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:06:44 PM
Creation date
11/28/2017 3:09:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. <br />Setting of Iron Monuments <br />C. <br />Surveying and Staking <br />D. <br />Public Street <br />E. <br />Public Sanitary Sewer System <br />E. <br />Traffic Control Signs, Street Signs and Development Identification Signs <br />F. <br />Underground Utilities <br />G. <br />Stormwater Management Facilities <br />The Improvements shall be installed in accordance with the Plans; the City subdivision ordinance; <br />City standard specifications for utilities and street construction; and any other ordinances <br />including those concerning erosion and drainage and any prohibiting grading, construction <br />activity, and the use of power equipment. The Developer shall submit plans and specifications <br />which have been prepared by a competent registered professional engineer to the City for <br />approval by the City Engineer. The Developer shall instruct its engineer to provide adequate field <br />inspection personnel to assure an acceptable level of quality control. In addition, the City may, at <br />the City's discretion and at the Developer's expense, have one or more City inspectors and a soil <br />engineer inspect the work as the City may reasonably determine. The Developer, its contractors <br />and subcontractors, shall follow all instructions received from the City's inspectors. The <br />Developer's engineer shall provide for on-site project management. The Developer's engineer is <br />responsible for design changes and contract administration between the Developer and the <br />Developer's contractor. The Developer or its engineer shall schedule a pre -construction meeting <br />at a mutually agreeable time at the City Council chambers with all parties concerned, including <br />the City staff, to review the program for the construction work. Within thirty (30) days after the <br />completion of the Improvements and before the "security" is released, the Developer shall supply <br />the City with a complete set of reproducible "as constructed" Plans, and an electronic file of the <br />4 <br />Tanager Estates -v1 -mpg -2123116 <br />4 <br />Tanager Estates -vi -mpg -2/23/16 <br />1893390 <br />1893390 <br />
The URL can be used to link to this page
Your browser does not support the video tag.