My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2016 Council Packet
Orono
>
City Council
>
2016
>
10-10-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:06:44 PM
Creation date
11/28/2017 3:09:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLAN E <br />Construction Activity and Traffic Control. <br />Due to the use of Heritage Lane as the access for site improvements and home construction, the following <br />conditions shall be implemented: <br />(a) The home construction contractor, for each new lot owner, shall meet with the Heritage Lane <br />neighbors at the outset and throughout the construction period as needed to answer any questions and <br />address any issues that they have; <br />(b) All construction traffic shall be parked within the new road and cul-de-sac and lots in the new <br />subdivision (signage required). <br />(c) Hours for road and home construction shall be restricted to 9:00 AM, to 4:00 PM Monday through <br />Friday (no Saturdays, Sundays or holidays) during the portion of the year when Orono Schools are in <br />regular session. During the summer months when Orono Schools are not in regular session, hours for road <br />and home construction shall be subject to the standard City code limitations on construction. activity <br />(Monday through Friday, 7:00 AM to 8:00 PM; Weekends and Holidays, 8:00 AM to 8:00 PM) (signage <br />required). <br />(d) Street sweeping of Heritage Lane shall be done on a daily basis; <br />(e) The contractor shall restrict the speed limit for construction vehicles to 15 MPH on Heritage Lane <br />(signage required). <br />(f) The contractor shall inform all employees, delivery trucks and subcontractors that if they fail to <br />abide by these restrictions they will not be allowed to work on the project; <br />(g) An email address and phone number for the contractor shall be given to the neighbors so they can <br />easily inform the contractor at any time if there are concerns that need to be addressed. <br />(h) The City will assist with monitoring traffic during the hours that school buses are expected to be <br />present if the City receives reports of repeated problems during the restricted hours as defined in item 8c <br />above. If it is determined by the City that a CSO or Officer needs to be present during the morning <br />Heritage Lane school bus schedule times, the City may arrange for a CSO or Officer to be present at those <br />specific times, and the Developer shall be billed the actual costs thereof at a cost of $50 per hour. School <br />bus pickup/dropoff times as provided by the Orono School District are as follows: <br />AM — Secondary: 7:00 — 7:20 Elementary: 8:20 - 8:40 <br />PM — Secondary: 2:55 - 3:15 Elementary: 4:05 - 4:25 <br />(i) If the majority of homeowners on Heritage Lane submit a written request, and only after a public <br />hearing and upon approval by the City Council, the City will install temporary speed bumps within <br />Heritage Lane. This provision shall apply only during road and home construction and shall not be <br />permanent. <br />0) Developer shall install signage within the right-of-way of Heritage Lane at a location to be <br />approved by the Public Works Director indicating that all construction traffic shall make right turns only <br />onto Shoreline Drive when exiting Heritage Lane (signage required). <br />The above conditions shall be included in the sale documents for each lot, and shall be enforced by the <br />Developer and Owner. Signage similar to that depicted on the following page (but with corrected <br />information as noted above) shall be obtained and posted by the Developer at locations to be approved by <br />the Orono Public Works Director. <br />CONSTRUCTION <br />HOURS ONLY <br />9AM-4PM <br />MON - FRI <br />(Only effective when <br />Orono Schools in session) <br />L J. <br />Council <br />Exhibit F <br />OVER <br />SEP 2 0 2016 <br />CITY OF ORONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.