Laserfiche WebLink
9/26/16 City of Orono Council <br />Based upon public and agency input, there is renewed interest to consider extending the proposed <br />multi -use trail along the east side of Wayzata Boulevard beginning at Old Long Lake Road and extending <br />south to a connection at the Luce Line Trail. If the City of Orono were to construct this section of trail in <br />the future, separate from the proposed Hennepin County Turnback project (Phase 2), the estimated cost <br />is between $400,000 and $470,000. <br />