Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Monday, January 25, 2016 9:50 AM <br /> To: Christine Mattson <br /> Subject: RE: 3590 North Shore Drive/#2016-00073 <br /> Chris, <br /> I've reviewed the site/grading plan—it is approved. <br /> 1. Perimeter erosion control measures should be installed by the Contractor and inspected by the City prior to any <br /> work, including demolition. Contractor must provide minimum 24 hour notice prior to inspection. <br /> 2. A separate utilities permit will required for the sanitary sewer disconnection and connection. <br /> Adam <br /> From:Christine Mattson <br /> Sent: Monday,January 25,2016 927 AM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject:3590 North Shore Drive/#2016-00073 <br /> Adam, <br /> We received a building permit application for a new single family home at 3590 North Shore Drive. The applicant went <br /> through the variance process and received several variances for this property. The building plans are not to scale. If you <br /> are able, please review and provide comments. If you need the full-sized set of building plans, please advise. <br /> Thank you. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono I MN � 55356(physical address) <br /> PO Box 66 � Crystal Bay I MN I 55323-0066 (mailing address) <br /> '�' 952.249.4620 � 8 952.249.4616 <br /> � cmattson@ci.orono.mn.us 0 �] www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: Monday, February 15,2016 <br /> 1 <br />