<br /> 1. Openings
<br /> The opening made in a concrete pavement must be so located that no side is within three (3) feet of a construction joint. If the
<br /> side of the opening is within three (3) feet of a construction joint,the concrete pavement must be removed to the joint. Before '�
<br /> breaking the concrete, the slab must first be cut with a concrete saw to a depth of not less than two (2) inches,and the exact :�
<br /> location thereof must be approved by the Hennepin County Department of Transportation. All broken concrete must be removed �
<br /> from site and disposed of. �
<br /> NO OPENINGS SHALL BE MADE IN PORTLAND CEMENT CONCRETE DURING WINTER MONTHS EXCEPT FOR
<br /> EMERGENCIES. IF OPENING HASTO BE MADE,ADJACENT EDGES WILL HAVE TO BE REMOVED ONE FOOT BEYOND
<br /> ORIGINAL EXCAVATION THE FOLLOWING SPRING AND REPLACED BY A PERMANENT PATCH.
<br /> 2. Backfill and Compaction
<br /> � After the excavation has been completed, the requirements for the backfill, i.e., kind of material,compaction,etc.,shall be the �
<br /> �; same as specified for the repairs made for "Trenching or Sub-surface Operations". (See paragraph "C" below). '�
<br /> 3. Replacement of Concrete �
<br /> The concrete used for the final surface repair shali consist of 3A42 high early strength concrete to meet Minnesota Department
<br /> _-;�:� of Transportation Specification dated 1983, Spec. No. 2301. This concrete to be secured only from commercial plants which �
<br /> � can furnish a mixture that is approved by Hennepin County. The final finish must be burlap dragged or broomed so that it will `'�
<br /> �' match the surface of the adjoining concrete slab, and cured with plastic paper. All construction joints shall be replaced. The �
<br /> fresh concrete patch shall be protected from all traffic contacts for at least 72 hours after it has been finished. `�
<br /> m�
<br /> B. BITUMINOUS PAVEMENTS '�`�� �"�"���'� ��
<br /> 1. Openings ��
<br /> �- When necessary to cut openings in Bituminous surfaced roadways, the size of opening and location thereof must conform to `�
<br />���' size and location specified in the permit, or to size specified by Hennepin County.When cutting the opening,the edges are to be
<br /> cut in a straight line, and sides to be smooth and vertical. No ragged edges permitted. Cutting to be done with saw, jack- 3
<br /> hammer, spades or similar approved tools. All excavated bituminous material to be removed from site and disposed of. No open- '�
<br /> ings shall be made in bituminous pavements during winter months except for emergencies. r�
<br /> ' 2. Backfill and Compaction '
<br /> �=
<br /> ' After the excavation has been completed, the requirements for backfill, i.e., kind of material, compaction, etc., shall be the �
<br />``� same as specified for the repairs made for "Trenching or Sub-Surface Operations". (See paragraph "C"below.) '�
<br />� �
<br /> •. 3. Replacement of Concrete Base
<br /> Use procedures listed under A-3. Allow the concrete to cure for 48 hours before placing bituminous materials. �
<br /> .zy; �
<br /> - 4. Bituminous Tack Coat
<br /> A tack coat shall be applied to all adjacent bituminous and concrete faces before placing the bituminous surface course. �
<br /> 5. Restoration of Blacktop
<br /> All blacktop surfaces are to be restored as soon as possible after backfilling has been completed. Bituminous surfacing material ��
<br /> may be obtained from most commercial "Blacktop" plants. The kind and grade must be approved by the Hennepin County ��
<br /> Department of Transportation. Replacement of the bituminous material shall be made in layers not to exceed two (2) inches in �
<br />_. depth,each layer to be compacted with an approved roller or vibrating tamper unless otherwise specially authorized. ����".-,'
<br /> 6. Damage to Blacktop �
<br /> Any blacktop area which has been scarred by equipment, lugs, cleats, teeth, etc., shall be replaced or repaired as directed by �
<br /> Hennepin County.
<br /> C. TRENCHING UR SUB-SURFACE OPERATIONS �
<br /> '' 1. Openings
<br /> �„q Trenches for conduits, water, steam, oil and gas pipes, sewers and other utilities placed within the right of way shall be located �
<br /> as approved by Hennepin County. Trenches for construction along the highway shall not be opened for a distance of more than
<br /> s
<br /> ;' 300 feet at any one time, unless especially authorized. '
<br />�'f 2. Storage of Excavated Materials �
<br /> Excavated or other material shall be placed or stored on the side of the operation farthest from the traveled road unless other- �
<br /> wise authorized by Hennepin County,and in such manner that there will be no interference with the flow of water in any gutter, �
<br /> drain,pipe, culvert,ditch or other waterway. '�
<br /> 3. Backfill and Compaction �
<br /> After excavation has been completed, it may be refilled with the excavated material which has been removed,with the following '
<br /> ��, exceptions: �'
<br /> � If the excavated material consists of mucky,soft or unstable soil,boulders,or large rock, it must be removed and disposed
<br /> ;�
<br /> of outside the county right of way,and replaced with granular (sandy) material. �
<br /> j;�
<br /> - The refilling of the trench shall be done with Class 3 gravel or other approved material compacted by the ordinary compaction �
<br /> method and shall follow as rapidly as possible the placing of sub-surface structures and shall be completed in such manner as :�
<br /> will conform to the earth shoulder or subgrade or as directed by the Hennepin County Department of Transportation. ��
<br /> �` �
<br /> 4. Replacement of Gravel Base �
<br /> The gravel base shall be replaced with approved material and compacted. All compaction must be in accordance with the Minne- ��
<br /> sota Department of Transportation Specifications dated 1983,Section 2105.3F2 "Ordinary Compaction Method". ;�