Laserfiche WebLink
�°�o <br /> C ITY OF ORONO <br /> RESOLUTION OF��Ez�Y COUNCIL <br /> � � <br /> � � .J <br /> `� G` N O. <br /> `�kESHO�� <br /> CONCLUSIONS, ORDER AND CONDITIONS <br /> Based on the above findings, City Council of Orono, Minnesota hereby grants a variance from <br /> Orono City Code Section 78-1279 to permit construction of a two-story addition 12 feet from <br /> the top of the bluff where a 30 foot setback is required; a variance from Orono City Code <br /> Section 78-1279 to permit construction of a two-story addition 12 feet from the top of the bluff <br /> where a 20-foot bluff impact zone setback is required; and a variance from Orono City Code <br /> Section 78-1279 to permit construction of a two-story addition ahead of the average lakeshore <br /> setback, 87 feet from the ordinary high water level (OHWL) of the lake where a 90.1 foot <br /> setback is required as determined by the neighboring home to the east, subject to the following <br /> conditions: <br /> 1. Council approval is based on the survey and building plans submitted by the Applicant <br /> and annotated by City staff, attached to this Resolution as Exhibits A 8� B. Any <br /> amendments to these plans may require further Planning Commission and City Council <br /> review. <br /> 2. Hardcover shall not increase above 4,812 square feet or 25%, as 25% is permitted in <br /> Tier 1. Any changes to the plans or the Property which result in an increase in <br /> hardcover above the allowed levels are not approved as part of this variance request. <br /> 3. Owner shall comply with the permitting requirements of the Minnehaha Creek <br /> Watershed District (MCWD). <br /> 4. Owner shall comply with the recommendations of the City Engineer and Building <br /> Official during the permit review and construction process, including but not limited to <br /> the following: <br /> a) Owner shall submit engineering information due to the possibility of fill soils <br /> used to create a stable building pad for the existing home. <br /> b) The proposed structure shall be required to be installed on suitable origina� <br /> soils or engineered corrected soils which would need to be tested and <br /> approved by the designing engineer. <br /> c) The Owner shall submit a bluff slope stability analysis for review by the City's <br /> engineer prior to issuance of the building permit; <br /> 5. Authorities granted by this resolution run with the Property not with the Owner, but are <br /> permissive only and must be exercised by obtaining a building permit for the new <br /> construction and commencing construction of said project. A framing inspection must <br /> be completed within one year of the date of Council approval, or the variances will <br /> expire on that date (August 10, 2016). <br /> Page 4 of 6 <br />