Laserfiche WebLink
. , . <br /> . <br /> DETERMINING PERMIT FEES � <br /> ❑SAC Charge(2016 Rate=S2,485.00) S <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> �(If not prepaid,a sewer connection permit will not be issued) <br /> �Sewer Connection/Disconnect/Repair($50.011/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; cast iron <br /> ❑Water Coanection/Disconnect/Repair(550.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> ❑Water Availability For Fature Hook-Up to Water($50.00) $ <br /> Water Availabilitv Ezulanallon: <br /> Contractor installed line to inside of house for fuWre hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Pernut <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ 1.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ <br /> ADDITIONAL INFORMATION—WATER METERS <br /> • WATER METERS must be picked up and paid for at Orono City Hall,these are on a se arate.permit. <br /> • WATER METERS must be set and sesled by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> T'he undersigned hereby applies to the City of Orono for issuance of a Utility Permit,agrees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota,and c 'fie that all s tements made on ' application are,true and conect. <br /> Applicant: Date: �' � � <br /> "� � <br />