Laserfiche WebLink
• ftick Stein <br /> March 29,2000 <br /> Page 2 of 2 <br /> 3. The repair option for this beam is: <br /> a. Install 1/2" CDX plywood over entire exterior surface of east wall from bottom <br /> of lintel to top plate (in area approximately 19 feet Iong .and 60" high at the <br /> Pe�)• <br /> b. Prior to instaliation of plywood, remove all siding and insulation board. <br /> c. Repair any damaged studs. <br /> d. If top plate is not 3" wide, install blocking snug between studs to provide 3" <br /> blocking at roof line. <br /> e. Glue 1/2" plywood to all studs, bottom beam and top plates. <br /> f. Nail plywood to bottom beam (lintel) with four rows of power nails (.131 <br /> diameter)C�3 6" O.C. <br /> g. Nail plywood to top plate or studs with eight power nails every 16". <br /> h. Provide.power nailing to studa in remainder of field� 6" O_C. _ <br /> PROFESSIONAL OPINION <br /> 4. It is my professional engineering opinion that this modification will provide a <br /> suitable lintel beam support for the east wall of the residence and meet the <br /> requirements of the Code. <br /> GENERAL <br /> 5. The observationa and opinions expressed in this report were based on my <br /> professional engineering judgment and professional practice as well as the visual <br /> inspection. <br /> If you have any queations, please contact me. <br /> Sincerely, <br /> J. H. DAHLMEIER ENGINEERING, INC. <br /> Jo . Dahlmeier, P.E. � <br /> JHD:Im <br /> I hereby certify that this plan, specification or report <br /> was prepared by me or under my direct eupervision and <br /> that I am a duly registered professional engineer under <br /> the laws of the State of Minnesota. <br /> Mi sota Registration No. 9212 <br />