Laserfiche WebLink
� °� � <br /> o ; �, o <br /> �������T- C ITY of ORONO <br /> � } <br /> a '���'`j�.:t.- D., <br /> , - - � <br /> '�,� �s;�.`P �,�'�— ti <br /> � ''�-- I`' '�'� RESOLUTION OF THE CITY COUNCI L <br /> '� �'`��I�1��G/ 3064 <br /> �kESIIO� NO. <br /> 1. Hardcover in the 75-250' zone is approved at a level of <br /> 50.6$. All existing and proposed hardcover approved <br /> with this variance approval is recorded in the - <br /> calculation worksheet and diagram enclosed with the <br /> resolution as Page 6. The current p�operty owner and <br /> all future owners of the property are placed on notice <br /> that hardcover shall not be increased above the <br /> currently approved level, and any proposed improvements <br /> over the property that would result in additional <br /> hardcover in either the 0-75' or 75-250' zone must be <br /> � approved by the City. Such approval may result in <br /> requirement for concurrent equivalent or greater <br /> removals of existing hardcover. Any existing hardcover <br /> \ not shown on the approved hardcover diagram and <br /> calculation worksheet shall be removed no Iater than <br /> June 1, 1992. <br /> 2. The garage shall be reconstructed to meet the required <br /> 10' west side setback. The west and south wa 1 ls of <br /> said garage shall then be retrofitted with proper slab <br /> reinforcements subject to review and approval by the <br /> Building Inspector. Further, if the garage is <br /> reconstructed such that the roof line continues to <br /> discharge in a westerly direction, applicant shall � <br /> provide a roof gutter system to direct such drainage to <br /> the north of the garage, away from the remaining <br /> portions of slab adjacent to the west and south lot <br /> lines. <br /> 3. Priar to commencement of reconstruction or completion <br /> of the garage, applicant shal 1 provide the building <br /> inspector with suitable construction plans conforming <br /> to the conditions of this resolution, and shal 1 obtain. <br /> the appropriate permit f or such construction. In <br /> addition to the normal building permit fee, applicant <br /> shall pay the after-the-fact investigation fee for the <br /> building permit because construction was commenced <br /> prior to issuance of the building permit. <br /> 4. Applicant shall pay the after-the-fact investigation <br /> fee for the zoning application because construction was <br /> commenced without the proper variance approval s being <br /> obtained. - <br /> Page 5 of 9 <br />