My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-09-2017 Council Work Session Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
1974-2024 Minutes - work sessions
>
2017
>
10-09-2017 Council Work Session Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2017 9:02:08 AM
Creation date
11/9/2017 9:02:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Old Crystal Bay Road <br /> A. Discuss and Present Concepts and Strategy <br /> Adam Edwards, Dave Martini, and Chris Chromy entered the meeting at 6:25 p.m. <br /> Director of Public Works/City Engineer Adam Edwards presented the Old Crystal Bay Road <br /> item and introduced the Work Session guests. <br /> Edwards mentioned that the city is ready to engage with the school and would like to make sure <br /> the Council is onboard with discussion to be had with the school. <br /> Principal Transportation Engineer, Chris Chromy walked through the project area plans and <br /> layouts. Chromy explained that they have been looking at what the traffic needs are. Densely <br /> spaced driveways; Pedestrian and vehicle conflicts and intersections were some of the first <br /> challenges noticed. Chromy also noted that the peak timeframe used for this study was between <br /> 7:00-8:00 a.m. and 2:30-3:30 p.m. <br /> Dankey asked if the timeframe should be 7:00-9:00 a.m.,because of the elementary. <br /> Chromy mentioned that the times represented in the slide are the peak times only. He discussed <br /> various options that are available for remedies. The High school and Middle school area has <br /> been concluded to be the area which seems to have the intersections with the most traffic issues. <br /> Dankey asked if this was current, as the trial project is not shown in the layout. Principal <br /> Engineer, Dave Martini mentioned this demonstration is from prior to the right in, right out trial <br /> project. Slides are showing existing conditions for congestion and on campus congestion and <br /> safety. <br /> Chromy demonstrated three alternatives to the Council. Chromy added that Bolton& Menk <br /> would also like to illustrate issues with the road way to the school and present the alternatives <br /> that could help and manage the traffic issues on Old Crystal Bay Road. No actions were taken at <br /> this meeting. <br /> Meeting End Time: 6:49 p.m. <br /> ATTEST: <br /> 1. , �, � <br /> :'ti.. :� <br /> Anna Carlson, City Clerk Dennis Walsh, Mayor <br />
The URL can be used to link to this page
Your browser does not support the video tag.