My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01273 - demo
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
3260 North Shore Drive - 08-117-23-41-0007
>
Permits/Inspections
>
2014-01273 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:46:57 PM
Creation date
11/8/2017 1:53:23 PM
Metadata
Fields
Template:
x Address Old
House Number
3260
Street Name
North Shore
Street Type
Drive
Address
3260 North Shore Dr
Document Type
Permits/Inspections
PIN
0811723410007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � ' � , <br /> ' 4, Submit a$2,500 escrow and an escrow agreement signed by the property owner. <br /> 5. Keep all structure(s)enclosed and/or secured until such time as demolition is complete. <br /> 6. Keep all demolition debris off adjoining property and/or the pubiic rights-of way unless speafic <br /> prior approval is obtained in writing for temporary use thereof. <br /> 7. Completely remove foundation(s)from the ground. <br /> 8. Completely dispose of ali demolition debris off site in acxordance with all appiicable PCA <br /> requirements. <br /> 9. Abandon water welis in accordance with State Health Department regulations. <br /> 10.Call for an inspection when all debris has been removed, before badcfilling. <br /> 11.Within 5 working days of superstructure removal, a final inspection shall be requested. The site <br /> shall be left ctean and clear of all debris, with any excavation filled with earth level with the <br /> adjacent ground elevation (except when such excavation is to be used as part of a new building <br /> and such new building is actually under construction). <br /> 12.Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, <br /> crushed and filled with native soils. An inspection is required after the tanks are pumped and <br /> before the tanks are crushed and filled. <br /> 13.The undersigned owner shall and hereby does indemnify and hold harmless the Ciry of Orono, <br /> its agents, employees and assigns from and against all daims, damages, fosses or expenses, <br /> including attomey fees: against the City, its agents, employees and assigns arising out of or <br /> resulting from the demolition described herein as performed by the property owner, his <br /> employees, agents, subcontradors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> �$75.00—Principal Structure $ �S.� <br /> ❑ $50.00—Accessory Structure x (how many) <br /> 1. Subtotal of above permit requested $ �S •� <br /> 2. State Surcharge 5.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ � •� <br /> The undersi�ned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do <br /> all the work in a strict acxordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certfies that all statements made on this application are complete,true and correct. <br /> Applicant's Signature: Date: � 1 <br /> Owner's Signature: �_ Date: <br /> ApP�oved By: Date: !b •� a - f�1 <br /> ( ilding Offiaal) <br /> *Zoning Disclosure Required2 ❑ YES NO <br /> 'This must be filled out by Zoning Depa�tment—For e' er answer,a Zoning Official must sign all applications. <br /> *Approved By: o'�G , '`- /yl ,C � Date: /V '3�' �-- <br /> (Zoning Official) <br />
The URL can be used to link to this page
Your browser does not support the video tag.