My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01129 - septic
Orono
>
Property Files
>
Street Address
>
N
>
North Arm Drive
>
515 North Arm Drive- 06-117-23-31-0015
>
Septic
>
2015-01129 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:21 PM
Creation date
11/8/2017 8:32:49 AM
Metadata
Fields
Template:
x Address Old
House Number
515
Street Name
North Arm
Street Type
Drive
Address
515 North Arm Dr
Document Type
Septic
PIN
0611723310015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. DISTRIBUTION MEDUI:REGISTERED TREATMENT PRODUCTS:CMAAABERS AND EZFLOW <br /> A. Er►ter Dispersat Media: <br /> B. Enter the Componenc Len <br /> 8�� ft Enter the Canpcnent Width: �ft <br /> C. Number of Components per Row=ged�ng����by Component L.en <br /> � ft `(�'"''� .e gth(Round uP) <br /> l____�,J ft= �Componentslrow <br /> D. Actuat Bed Length-Number of Components/row X Component Len�ih: <br /> �c°mponents X �ft = �ft <br /> E. Nurr�ber of Raws=Bed Width divided b�r Component Width(Round uP) <br /> � ft t �� ft. �raws AdJust wldth so thls!s an whole rt�nber. <br /> F. Totai Num��po���s��af����r�x Number of Rows <br /> X � ' �comportents <br /> �.�J <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Ctean Sand Lift: 3 feet minua Depth to Limft�g C��n =�lean Sand Lift <br /> 3.0 ft - t.5 ft = 1.5 ft Desi�Sand Lift(optionat): �ft <br /> 8. Cakulate UPslope Mei�hC Ctean Sand Lift +media depth�crnrer(1 ft.)s UPslope Height <br /> 1.5 ft + 0.$ ft + 1.0 ft= 3.3 ft <br /> C. Select Upsl�e 8erm l�uitiptier ibased on tand stope): 2.55 <br /> t�nd Slope% 0 1 2 3 4 5 6 7 8 9 10 Il 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 236 2.31 Z26 2.21 <br /> Ratio 4:1 4.00 �.85 3:,7p 337 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Catcutate Upslope Bern�HHdth:AAultlptier X Upstope Mcund Height =Upslope Berm Width <br /> 2.55 ft X 3.3 ft = 8.3 ft <br /> E. Cattulate Drop in Elevacion Under Bed: Bed Vyidth X Land Stope+100=Or�(ft) <br /> 10.0 ft X 14.0 � + 100= 1.40 ft <br /> F. Calcuiate Downslope Mound Hei�t:Upstope Height+Drop in Elevation =Dowrul Hei ht <br /> � 6 <br /> 3.3 ft + 1.40 ft = 4J ft <br /> G. Select Downslope 8erm Muliiptier(based on land slope): 7.08 <br /> �� % � 1 2 3 4 S 6 7 8 9 10 li 12 <br /> �ownslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> eerrn Rstto 4:1 4.00 4.27 435 4.54 4.75 5.00 5.26 5.56 5.88 5.25 6.ST 7.14 7.69 <br /> H. Calculate Downstope Berm Width:Multipiier X Dovmslope Neight =Qownstope gern�Wid� � <br /> �•� x 4.7 ft = 32.9 ft <br /> i. Calcutate Minimum Berm to Cover Absorption,s,re�; ���q��t��+4 feet <br /> 16.0 ft *�ft � 20.0 ft <br /> �-------- <br /> �• DesiSn Downslope Berm=greater of 4H and 41: 32.9 ft <br /> K• Setect Endslope Berm Muttiplier. 3� <br /> (us�alty 3.0 w 4.0) <br /> L. Calculate Endstope germ X pownstope M��Height �Endslope germ yVidth <br /> 3•� ft X 4.7 ft = 14.0 ft � <br /> M.Cakutate Nb�nd Wfdth: Upst�e Berm yVidth+ged yy{�+ <br /> Downslope Berm Width <br /> 8.3 ft ; 10.0 ft + 32.9 ft = 5f.2 ft <br /> N. Calcutate Mound Length: Ex�ds(ope germ yyidth ,ged��gth +Endstope Berm Vyidth � <br /> 14.0 ft + 63.0 ft + 14.0 !t = 90.9 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.