Laserfiche WebLink
r .? �4 -� �`;� �n� �. <br /> ' " ���� <br /> ,; <br /> ^ -�a <<a'w:i.�' <br /> PETE BOYER CONSTRUCTION, INC. <br /> BUILDING CONSTRUCTION 19685 EXCELSIOR BOULEVARD <br /> November 7, 2005 EXCELSIOR, MINNESOTA 55331 <br /> (952) 474-8077 <br /> Lyle �man <br /> City of Orono <br /> PO Box 66 <br /> Crystal Bay, MN 55323 <br /> RE: 3145 North Shore Drive <br /> Orono, MN <br /> Dear Lyle, <br /> As you requested, I have supplied header and beam sizes and reduced the lower level <br /> garage door from 8'to 6' as shown on sheets S1, A1, A2, A7 & A8 (2 copies included). In <br /> response to the letter from Bonestroo, Rosene, Anderlik & Associates, Inc. dated May 12, <br /> 2005, I have addressed the issues raised in the letter in the following manner: <br /> 1. I expect tu import approximately 700 cubic yards of fill. <br /> 2. There will be no impact to the shared access. See Site Contours. <br /> 3. We will not need construction easements as we will not grade into Neighbor's <br /> property. <br /> 4. The swale is part of our regarding plan and is designed to keep our water on our <br /> property and lessen the amount which now drains across the neighbor's property <br /> to the south. <br /> 5. The amount of storm water generated by this site will be less in the future because <br /> the current plan as designed has less than 28% hardcover where the current <br /> hardcover is 35%. The water flow does currently run north across the neighbor's <br /> property to get to the pond and will continue to do this under the proposed plan. <br /> 6. The driveway easement does cross a portion of the northerly neighbor's property. <br /> Agreement was reached with the neighbor on the 29t" of April, 2005. This <br /> "Easement Modification and Joint Easement Ageement" is included in this <br /> submittal. <br /> 7. Uronberg and Associates have shown the location of the existing sewer in the <br /> drive easement on site plan revised on 11/4/2005. I have included 2 copies. I have <br /> also included a plan and cross section of city sewer provided to us by Greg Gappa <br /> from Orono Engineering. <br /> 8. The Sanitary Service Stub and location wi1.l not be affected by this construction as <br /> we plan to use the existing sewer line leaving the new home as long as it is in <br /> good condition. <br /> 9. Erosion control and sediment control fences have been detailed and shown on the <br /> revised site plan dated 11/4/2005 of which I have included 2 copies. <br /> T s, <br /> r <br /> % <br /> e Boyer <br />