Laserfiche WebLink
c�'�1�-C����� <br /> � . ��ITY OF ORONO APPLICATION FOR MECHANICAL PERMIT Page 1 of 3 <br /> . ; <br /> � CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City o�ces. Applications will be reviewed and a <br /> permit will be issued within two working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERNIITS ARE NOT VALID UNTIL YOU <br /> RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON THE JOB SITE. <br /> 3. Mechanical Designs-Complete calculations,details and specifications are required for each heating,ventilation, <br /> humidification-dehumidification, and air conditioning installation including heat loss/heat gain calculation, design <br /> temperatures, equipment ratings and identification as to type, manufacturer and model. Data shall be presented on form <br /> provided. Identification of and specifications for water heating equipment shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. <br /> 6. All work must be inspected(rough-in and final). Call (952)249-4600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions <br /> Complete all items on this application. Compute the permit fee. Sign and date the certification. INCOMPLETE <br /> APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call (952) 249-4600. <br /> Please check one: New Addition Repair Replace Residential Commercial <br /> JOB SITE: �(.V v�� QY` I j Y�Q � ✓\ Zip: ������ <br /> Owner's Name: n� .I� t �� � Phone Number: _ �/,� - ����- � � <br /> Mailing Address: �r�fi City: �.i�6'in�_Zip• 3�-� <br /> y <br /> Contractor's Name: ��w � G • Phone N mber• <br /> �CP� - `�� � ���� <br /> Mailing Address: City• Zip• �� <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: � r <br /> Make: L�1�1�� � ��y�y��� <br /> Model: �' �1 � �'T��`7J �o��".�'� � �ZJ"�/� <br /> Fuel: �' � , <br /> Flue Size: ��� <br /> Input BTUs: ��,�" l _ '�Q� ''� I'� <br /> Output BTUs: <br /> CFM: <br /> file://C:\Documents%20and%20Settings�rriimi\DesktoplCITY%200F%200RON0%20APPLICA... 7/31/2003 <br />