My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Geotechnical Evaluation report-2004
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2625 North Shore Drive - 09-117-23-42-0003
>
Misc
>
Geotechnical Evaluation report-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:51:21 PM
Creation date
10/19/2017 1:04:04 PM
Metadata
Fields
Template:
x Address Old
House Number
2625
Street Name
North Shore
Street Type
Drive
Address
2625 North Shore Dr
Document Type
Misc
PIN
0911723420003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aulik Associates <br /> Project BL-04-06716 <br /> October 11,2004 <br /> . Page 11 <br /> E.3. Groundwater Observations <br /> Ixnmediately after taking the final samples in the bottoms of the borings, the holes were probed through <br /> the hollow-stem auger to check for the presence of groundwater. Immediately a,fter withdrawal of the <br /> auger,the holes were again probed and the depths to water or cave-ins were noted. The borings were <br /> probed again and backfilled just prior to leaving the site. <br /> F. General Conditions . <br /> F.1. Basis of Recommendations <br /> The analyses and recommendations submitted in this report are based upon the data.obtained from the <br /> soil borings performed at the locations indicated on the attached sketch. Often,variations occur between <br /> these borings,the nature and extent of which do not become evident until additional exploration or <br /> construction is conducted. A reevaluation of the recominendations in this report should be made after <br /> performing on-site observations during construction to note the characteristics of any variations. The <br /> variations may result in additional foundation costs,and it is suggested that a contingency be provided <br /> for this purpose. <br /> It is recommended that we be retained to perform the observation and testing program for the site <br /> preparation phase of this project. This will allow correlation of the soil conditions encountered during <br /> construction to the soil borings, and will provide continuity of professional responsibility. <br /> F.2. Review of Design <br /> T'his report is based on the design of the proposed cazriage home as related to us for preparation of this <br /> report. It is recommended that we be retained to review the geotechnical aspects of the designs and <br /> specifications. With the review,we will evaluate whether any changes in design have affected the <br /> validity of the recommendations, and whether our recomtnettdanons have been correctly interpreted and <br /> implemented in the design and specifica�ions. <br /> F.3. Gronndwater Fluctuations <br /> We made water level observations in the borings at the tirnes and under the conditions stated on the <br /> boring logs. These data.were interpreted in the text of this report. 'The period of observation was <br /> relatively short, and fluctuations in the groundwater level may occur due to rainfall, flooding,irrigation, <br />
The URL can be used to link to this page
Your browser does not support the video tag.