Laserfiche WebLink
� 11. American Sociery of Hearing, Refrigerating and Air Condirioning Engineers <br /> (ASHRAE) <br /> � S. Materials and equipment shall be installed in a neat and workmanlike manner by skilled <br /> craftsmen. <br /> � T. Delivery of all materials and equipment shall be in accordance with the overall Project <br /> schedule. The Contractor shall closely coordinate all deliveries with other Contractors <br /> and the Engineer. <br /> � U. For materials and equipment specified by description only, the Contractor shall provide <br /> materials or equipment suitable for the purpose intended. These shall be in <br /> � conformance with all governing codes, these Specifications and normal trade practice. <br /> V. For materials or equipment specified by manufacturer's name and catalog number, the <br /> � Contractor shall provide the item specified. The Contractor may submit materials and <br /> equipment for prior approval to the Engineer. All prior approvals must be received by <br /> the Engineer at least seven working days prior to bid. <br /> � W. The Contractor shall fully instruct the Owner in the operation of each mechanical <br /> system prior to final closeout. <br /> � X. The Contractor shall provide and maintain an "As Built" set of bluelines on site, neatly <br /> notating routing, location or other changes to the Contract Documents. Upon Project <br /> completion and prior to final close out,turn the "As Built"drawings over to the Owner. <br /> � Y. The Contractor shall guarantee all materials and equipment to be free of defects that may <br /> develop in any part of their work, caused by faulty warkmanship, material or <br /> equipment failures, for a minimum one year or for as long as normal equipment <br /> � manufacturers warranty is in effect from the date of final acceptance of the work. <br /> Z. Upon completion of the work shown and specified under Division 15000 and prior to <br /> final close out of the Project, the Contractor shall verify in writing that all systems are <br /> �' 100% complete and operating properly. This notification shall include copies of all <br /> Subcontractor notifications. <br /> � AA. The Contractor shall deliver two sets of O&M manuals to the Engineer prior to final <br /> close out. O&M manuals shall consist of approved shop drawings, manufacturer's <br /> bulletins, equipment manuals, a list of manufacturers with telephone numbers for all <br /> � equipment that contains replaceable parts and all other data covering the care, <br /> maintenance and operation of each piece of furnished equipment. O&M manuals shall <br /> be neatly bound in 3-ring binders, contain an index and section tabs and be labeled <br /> � with the Project name. <br /> BB. The Contractor shall be responsible for all deficiencies that may exist from the use of <br /> substitute products, including additional required work. All dimensions and <br /> � characteristics of substitute products shall be verified and coordinated with all affected <br /> trades and Subcontractors. Required changes incuned from using accepted substitute <br /> products shall be coordinated and performed by the Contractor at no additional cost to <br /> � the Owner. <br /> CC. Upon notification by letter, personal contact or telephone conversarion of a problem <br /> with the mechanical system, the Contractor shall respond within one week, making <br /> � repairs or corrections as necessary. After all repairs and corrections are complete, the <br /> Contractor shall notify the Engineer. <br /> � 032597 CBA701 g/1/9� <br /> 15010- 3 <br /> j <br />