Laserfiche WebLink
� SECTION 15010 <br /> GENERAL CONDI'I'IONS <br /> � <br /> 1.00 GENERAL <br /> � A. General and Supplementary conditions within Division 1 are hereby incorporated and <br /> become part of these Specifications, covering all work in Division 15000, Mechanical. <br /> � B. Contractors shall familiarize themselves with all Architectural, Structural and Electrical <br /> Drawings and Specifications. These Drawings and Specifications, as they affect the <br /> mechanical installation, shall become part of Division 15000 Contract Documents. <br /> � C. The Mechanical Drawings and Specifications shall form a set of Plans for the <br /> mechanical work. Neither the Drawings nor the Specifications shall be complete <br /> � without the other. Any item shown on the Drawings or specified in the Specifications <br /> shall be considered as shown and specified on both. <br /> D. Any questions regarding the intent of the Drawings or Specifications shall be brought to <br /> � the Engineer's attention as soon as possible. If direction from the Engineer cannot be <br /> obtained due to time or communication limitations, the greater quantity, higher quality <br /> or condition most favorable to the Owner shall be assumed. <br /> � E. Mechanical Drawings are diagrammatic and are intended to show approximate locations <br /> only. The Contractor shall thoroughly review all Architectural, Structural and Electrical <br /> � Drawings and Specifications. Placement of inechanical equipment and devices shall not <br /> interfere with locations or clearances of other trades' materials or equipment. <br /> Contractor shall provide 1/4" scale drawing of all mechanical rooms, indicating <br /> placement of all mechanical and electrical equipment. Submit drawing to Engineer for <br /> � approval. <br /> F. The following terms used in the Drawings and Specifications shall be defined as <br /> � follows: <br /> 1. Contractor: Shall mean Mechanical Contractor or any of their Subcontractors. <br /> 2. Work: Shall mean labor and/or materials of the Mechanical Contractor or any of <br /> their Subcontractors. <br /> � 3. Furnish: Shall mean purchase, submit for Engineer approval, coordinate with <br /> Contract Documents and deliver to site in new, undamaged condition. <br /> 4. Install: Shall mean to schedule for delivery, deliver or have delivered to the site, <br /> � store as directed, protect from damage, set in place, make all necessary final <br /> connections, test as required and turn over to the Owner in full operating <br /> condition. <br /> � 5. Provide: Shall mean fumish and install. <br /> 6. Connect: Shall mean to bring mechanical service and/or control wiring to <br /> equipment, make all final connections, provide all necessary miscellaneous <br /> materials required and do final check out to ensure proper equipment connections. <br /> � G. The Contractor shall visit the site and familiarize themselves with the conditions <br /> effecting Division 15000 work. No additional costs to the Owner shall be allowed for <br /> � items verifiable during site visits. <br /> H. The Contractor shall provide storage for materials and equipment supplied as required. <br /> � Location shall be as directed by the General Contractor or the Project Manager. <br /> � 032597 CBA701 8/1/97 <br /> 15010 - 1 <br /> j <br />