Laserfiche WebLink
. ' <br /> WOODHOUSE RESIDENCE <br /> ' <br /> D. Starting from lower edge of starter strip, lay additional <br /> 36 inch wide strips of underlayment in lap cement, to ' <br /> produce a two ply membrane. Weather lap plies and nail in <br /> place. Lap ends and stagger each consecutive ply. <br /> E. Extend eave/ice dam protection membrane minimum 4 ft ' <br /> upslope beyond interior face of exterior wall. <br /> 3 . 03 INSTALLATION - PROTECTIVE UNDERLAYMENT <br /> � <br /> A. Place one ply of underlayment over area not protected by <br /> eave protection, with ends and edges weather lapped and <br /> nailed. Stagger end laps of each consecutive layer. , <br /> B. Install perpendicular to slope of roof. <br /> C. Weather lap and seal watertight with plastic cement, items ' <br /> projecting through or mounted on roof. <br /> 3 . 04 INSTALLATION - VALLEY PROTECTION ' <br /> A. Place one ply of smooth surfaced roll roofing, centered <br /> over valleys. Weather lap joints and nail in place. ' <br /> B. Place one layer of sheet metal flashing, minimum 24 inches <br /> , wide, centered over open valleys and crimped to guide ' <br /> water. Weather lap joints. <br /> 3 . 05 INSTALLATION - METAL FLASHING <br /> A. Install flashings in accordance with RCSHSB requirements . � <br /> B. Weather lap joints and seal weather tight with plastic � <br /> cement. Secure in place with concealed fastenings. <br /> C. Flash and seal work projecting through or mounted on ' <br /> roofing with plastic cement, weather tight. <br /> 3 . 06 INSTALLATION - SHINGLES <br /> A. Install shingles in accordance with manufacturer's ' <br /> instructions . <br /> B. Provide triple course at eaves . ' <br /> C. Project first course beyond face of fascia boards . ' <br /> D. Coordinate installation of weather tight placement of <br /> counter flashings . <br /> E. Complete installation to provide weather tight service. ' <br /> . � <br /> END OF SECTION , <br /> � WOOD SHINGLES - 07313-3 � <br />