Laserfiche WebLink
� ' <br /> WOODHOUSE RESIDENCE <br /> PART 3 EXECUTION ' <br /> 3 . 01 EXAMINATION AND PREPARATION � <br /> A. Prime paint surfaces of items or assemblies in contact with <br /> cementitious materials, before installation. � <br /> 3 . 02 INSTALLATION <br /> A. Install work in accordance with AWI Custom Quality � <br /> Standard. <br /> B. Set and secure materials and components in place, plumb and � <br /> level. <br /> C. Install trim by finish nails sunk. y � <br /> D. Install prefinished paneling with adhesive by the bead <br /> method (exterior type) . <br /> 3 . 03 PREPARATION FOR FINISH � <br /> A. Sand work smooth and set exposed fasteners. Apply wood - � <br /> filler in exposed fastener indentations . <br /> 3 . 04 SCHEDULE <br /> A. Exterior: � <br /> 1 . Beaded Plywood, adhered to bottom of ceiling joists : <br /> Prepare for paint finish. •� <br /> 2 . Columns at Kitchen Entry: Prepare for paint and sealed <br /> finish. <br /> 3 . Soffits and Facias : Match existing as noted on � <br /> drawings. Prepare for paint finish. <br /> 4. Door Head: 5-1/2" match verticle trim and plinth block <br /> as in exisiting door trims, prepare for paint finish. <br /> B. Interior: � <br /> 1 . Door, Trims : 5-1/2" head trim, match verticle trim and <br /> plinth block as in exisiting door trims, prepare for , <br /> paint finish. <br /> 2 . Window Trims: 5-1/2" head trim, match verticle trim in <br /> exisiting door trims, prepare for paint finish. � <br /> 3 . Bases Trim: 4" , prepare for paint finish. <br /> 4 . Crown moulding (Bath 1) : 3-3/8" , prepare for paint <br /> finish. <br /> END OF SECTION � <br /> � ► <br /> , <br /> . ' <br /> FINISH CARPENTRY - 06200-2 � <br />