Laserfiche WebLink
. _ � <br /> WOODHOUSE RESIDENCE <br /> � <br /> 3 . 04 PLACING CONCRETE <br /> A. Prepare previously placed concrete b cleanin with � <br /> Y g steel <br /> brush and applying bonding agent. Apply bonding agent in <br /> accordance with manufacturer's instructions . � <br /> B. Screed slabs-on-grade and concrete base for toppings level, <br /> maintaining surface flatness of maximum 1/8 inch in 10 ft, � <br /> unless otherwise noted on drawings . <br /> 3. 05 FORM REMOVAL <br /> A. Do not remove forms or bracing until concrete has gained S <br /> sufficient strength to carry its own weight and imposed <br /> loads . <br /> _ � <br /> B. Remove formwork progressively and in accordance with code <br /> requirements. <br /> 3 . 06 CURING � <br /> A. Immediately after placement, protect concrete from � <br /> premature drying. <br /> . B. Maintain concrete with minimal moisture loss at relatively � <br /> .' constant temperature for period necessary for hydration of <br /> cement and hardening of concrete. <br /> 3 . 07 CONCRETE FINISHING � <br /> A. Provide concrete surfaces to be left exposed with sand <br /> float finish. � <br /> END OF SECTION <br /> � <br /> � <br /> � <br /> � <br /> - � � <br /> ;�� � <br /> . � <br /> CONCRETE - 03001-3 , <br />