My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Renovate/addition project manual-1997
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2625 North Shore Drive - 09-117-23-42-0003
>
Misc
>
Renovate/addition project manual-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:51:23 PM
Creation date
10/19/2017 12:55:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2625
Street Name
North Shore
Street Type
Drive
Address
2625 North Shore Dr
Document Type
Misc
PIN
0911723420003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> WOODHOUSE RESIDENCE <br /> � <br /> 1 .26 STARTING SYSTEMS <br /> � A. Ensure that each piece of equipment or system is ready for <br /> operation. <br /> � B. Execute start-up under supervision of responsible persons <br /> in accordance with manufacturers' instructions . <br /> � 1 .27 DEMONSTR.ATION AND INSTRUCTIONS <br /> A. Demonstrate operation and maintenance of Products to Owner <br /> prior to date of final inspection. <br /> � B. For equipment or systems requiring seasonal operation, <br /> perform demonstration for other season within six months. <br /> 't 1 .28 CONTRACT CLOSEOUT PROCEDURES <br /> � A. Submit written certification that Contract Documents have <br /> been reviewed, Work has been inspected, and Work is <br /> complete in accordance with Contract Documents and ready <br /> for Construction Managers inspection. <br /> � B. Submit final Application for Payment identifying total <br /> adjusted Contract Sum/Price, previous payments, and amount <br /> � remaining due. <br /> 1 .29 FINAL CLEANING <br /> � A. Execute final cleaning prior to final inspection. <br /> B. Clean interior and exterior �surfaces exposed to view. <br /> � Vacuum carpeted and soft surfaces. <br /> C. Clean debris from site, roofs, gutters, downspouts, and <br /> � drainage systems. <br /> D. Replace filters of operating equipment. <br /> � E. Remove waste and surplus materials, rubbish, and <br /> construction facilities from the site. <br /> � 1 . 30 ADJUSTING <br /> A. Adjust operating Products and equipment to ensure smooth <br /> � and unhindered operation. <br /> � <br /> � <br /> � BASIC REQUIREMENTS-01001-7 8/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.