My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Renovate/addition project manual-1997
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2625 North Shore Drive - 09-117-23-42-0003
>
Misc
>
Renovate/addition project manual-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:51:23 PM
Creation date
10/19/2017 12:55:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2625
Street Name
North Shore
Street Type
Drive
Address
2625 North Shore Dr
Document Type
Misc
PIN
0911723420003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> SECTION 00007 � <br /> OWNER FURNISHED ITEMS AND OWNER'S OTHER CONTRACTORS � <br /> 1 - OWNER FURNISHED ITEMS - The following generally described Items shall be furnished <br /> by Owner and shall be receive, unloaded, stored and installed by Contractor: � <br /> • Appliances, consisting of Range, Range Hood, Refrigerator and Dishwasher <br /> • Garbage Disposal � <br /> • Decorative Pedestal Sinks with FauceULever Sets � <br /> • Decorative Water Closets <br /> • Multi-Spray Shower Heads � <br /> 2 - OWNER'S OTHER CONTRACTORS - The following generally described Trade Activities, � <br /> on a furnished and installed basis, shall be performed by Owner's other Contractors: <br /> • Kitchen Cabinet Cabinets and Countertops � <br /> • Guest Bath Linen Cabinet <br /> • Louver Shutters � <br /> • Carpet and Pad ' <br /> • Painting and Wall Coverings, Interior and Exterior <br /> • Security, Intercom and Audio Systems � <br /> 3 - COORDINATION AND SCHEDULING - The Contractor shall assist the Project Manager � <br /> with the coordination and scheduling of the hereinabove Items and Activities. <br /> When preparing its Progress Schedule, the Contractor shall contemplate the Kitchen Cabinets, , <br /> Countertops and Guest Bath Linen Cabinet wiii arrive at the Jobsite during the last week of <br /> October, 1997. The other Owner Furnished Items shall be availab�e to the Contractor in <br /> accordance with its Progress Schedule. � <br /> � <br /> � <br /> � <br /> OWNER I�UIZNIS1Il�:l) I�f�l�h1ti nNl)O\1'N}:k�S O"1-Ill�:lt C<)N�Il2nCl�UR�(luO(17 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.