Laserfiche WebLink
� <br /> � � � � � <br /> Comvatibility and adhesion test re�rts from latex additive manufacturer indicating that brick <br /> pavers have been tested for compatibility and adhesion with mortar and grout containing latex � <br /> additives. Include latex additive manufacturers' interpretation of test results relative to mortaz and <br /> grout performance and recommendations for installation practices needed to obtain adhesion. <br /> �JALTTY ASSURANCE � <br /> Installer ualif'ications: Engage an experienced Installer who has successfully completed unit <br /> paver installations similar in material,design, and extent to that indicated for Project. � <br /> Sin�le-Source Resvonsibilitv: Obtain each color,type,and variety of unit pavers,joint materials, <br /> and setting materials from a single source with resources to pmvide products and materials of � <br /> consistent quality in appearance and physical properties without delaying progress of the Work. <br /> DELIVERY.STORAGE.AND HANDLING � <br /> Protect unit�avers and aQaregate during storage and construction against wetting by rain, snow,or <br /> ground water and against soilage or contamination from earth and other materials. <br /> Protect �out and mortar rriaterials from deterioration by moisture and temperature. Store in a dry � <br /> location or in a waterproof container. Keep containers tighdy closed and away from open flame. <br /> Protect liquid components from freezing. � <br /> PROJECT CONDTTIONS <br /> Cold-Weather Protection: Do not use frozen materials or materials mixed or coated with ice or � <br /> frost. Do not build on froun subgrade or setting beds. Remove and replace unit paver work <br /> damaged by frost or freezing. _ <br /> Weather Limitations: Protect unit paver work against freezing when atmospheric temperature is � <br /> 40 deg. F(4 deg. C)and faling. Heat materials and provide temporary protection of completed <br /> portions of unit paver work. Comply with International Masonry All-Weatl�r Conncil's "Guide , <br /> Specification for Cold-Weather Masonry Constr�crion," Section 04200,Article 3. <br /> Hot-Weather Reauirements: Protect unit paver work when t�mperature and humidity conditions <br /> produce excessive evaporation of setting beds and grout. Provide artificial shade and wind breaks � <br /> and use cooled materials as required. Do not apply mortaz to substrates with temperatures of 100 <br /> deg. F(38 deg C)and above. <br /> PART 2 - PRODUC'fS � <br /> �ANUFACTURERS <br /> A ' • Sub'ect to com liance with re uirements manufacturers offerin � <br /> products which may be incorporated in the Work include but are not limited to the follow'g: <br /> � <br /> SECTION 02515 -iJrTIT PAVERS � <br /> Page 2 of 6 <br /> � <br /> , <br />