Laserfiche WebLink
�. <br /> AGGREGATE SURFACE � <br /> SHALL CONFORM TO WHAT IS REFERRED TO AS "BASEBALL MIX". <br /> � <br /> PART 3 - EXECUTION <br /> . 3.1 EXAMINATION OF CONDITIONS � <br /> A. EXAMINE ALL CONDITIONS, LEVELS, ELEVATIONS, DRAINAGE, ETC. PRIOR <br /> TO COMMENCEMENT OF WORK. � <br /> B. IF SUBGRADE CONDITIONS ARE DEEMED UNSATISFACTORY, HAVE <br /> CONDITIONS CORRECTED BY THE CONTRACTOR BEFORE PROCEfDING. � <br /> 3.2 SUBGRADE PREPARATION <br /> SEE SECTIONS 01051 AND 02200. , <br /> 3.3 AGGREGATE BASE COURSE � <br /> A. AGGREGATE BAS� COURSf CONSTRUCTION SHALL PROCEED AS FOLLOWS ONLY <br /> AFTER THE LA/E HAS APPROVED THE SUBGRADE CONSTRUCTION AND <br /> COMPACTION TESTS. � <br /> B. THE FINISHED SURFACE OF AGGREGATE BASE COURSE SHALL NOT VARY <br /> MORE THAN 0.05 FOOT FROM THE ELEVATION GRADES SHOWN ON THE ' <br /> DRAWINGS. <br /> C. THE AGGREGATE BASE COURSE SHALL BE COMPACTED IN ACCORDANCE WITH <br /> MN/DOT 2211 .3 C1 (SPECIFIED DENSITY METHOD>. � <br /> 3.4 AGGREGATE SURFACE COURSE <br /> A. AGGREGATE BASE COURSE CONSTRUCTION SHALL PROCEED AS FOLLOWS ONLY � <br /> AFTER THE LA/E HAS APPROVED THE SUBGRADE CONSTRUCTION AND <br /> COMPACTION TESTS (EXCEPT CHANGE SUBGRADE PLUS BASE COURSE) . � <br /> B. THE FINISHED SURFACE OF AGGREGATE BASE COURSE SHALL NOT VARY <br /> MORE THAN 0.05 FOOT FR�I THE ELEVATION GRADES SHOWN ON THE <br /> DRAWINGS. , <br /> C. THE AGGREGATE SURFACE COURSE SHALL BE WETTED AND COMPACTED WITH <br /> A SMOOTH DRUM .ROILER. � <br /> 1 � ' <br /> � <br /> � <br /> . � <br /> SECTION 02513 AGGREGATE <br /> PAGE 2 OF 2 1 <br />