My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Garden development project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Garden development project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:18:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � . � <br /> � . . <br /> 3.07 FIELD QUALITY CONTROL <br /> � Quality Control Testin� DurinR Construction: Allow testing service to inspect and <br /> approve subgrades and fill layers before further construction work is performed. <br /> Perform field density tests in accordance with ASTM D 1556 (sand cone method) or <br /> t ASTM D 2167 (rubber balloon method), as applicable. <br /> FootinR Sub�rade:. For each strata of soil on which footings will be placed, conduct <br /> Iat least one test to verify required design beacing capacities. Subsequent . <br /> verification and approval of each footing subgrade� may be based on a visual <br /> ' comparison of each subgrade with related tested strata, when acceptable to <br /> � L� � � <br /> Paved Areas and BuildinA Siab Sub�rade: Make at least one field density test of <br /> ' subgrade for every 2000 sq. ft. of paved area or building slab, but in no case less <br /> than 3 tests. In each compacted fill layer, make one field density test for every <br /> 2000 sq. ft. of overlaying building slab or paved area, but in no case less than 3 <br /> tests. <br /> � Foundation Wall Backfill: Take at least 2 field density tests, at locations and <br /> elevations as directed. <br /> tTrenches: Take at least one test per 100 lineal feet of depth in all trench areas. <br /> If in opinion of Lp�� based on testing service reports and inspection, <br /> � subgrade or fills wnicn nave been place are below specified density, provide additional <br /> compaction and testing at no additional expense. <br /> � 3.08 MAINTENANCE: � <br /> Protection of Graded Areas: Protect newly graded areas from traffic and erosion. Keep <br /> free of trash and debris. <br /> � Repair and re-establish grades in settled, eroded, and rutted areas to specified <br /> tolerances. <br /> ' Reconditioning Compacted Areas: Where completed compacted areas are disturbed by <br /> subsequent construction operations or adverse weather, scarify surface, re-shape, and <br /> compact to required density prior to further construction. <br /> � Settlin : Where settling is measurable or observable at excavated areas during general <br /> _� <br /> project warranty period, remove surface (pavement, lawn or other finish), add backfill <br /> ' material, compact, and replace surface treatment. Restore appearance, quality, and <br /> condition of surface or finish to match adjacent wock, and eliminate evidence of <br /> restoration to greatest extent possible. <br /> � 3.09 DISPOSAL OF EXCESS AND WASTE MATERIALS: <br /> Removal to Designated Areas on Owner's Property: <br /> � EARTHWORK 02200 - 9 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.