Laserfiche WebLink
', <br /> , <br /> Provide protection for roots over 1-1/2" diameter cut during consiruction ' <br /> operations. Coat cut faces with an emulsified asphalt, or other acceptable coating, <br /> formulated for use on damaged plant tissues. Temporarily cover exposed roots <br /> with wet burlap to prevent roots from dryinR out; cover with earth as soon as ' <br /> possible. <br /> Repair or replace trees and vegetation indicated to remain which are dama�;ed by <br /> construction operations, in a manner acceptable to Architect. , <br /> Replace trees which cannot be repaired and resto�ed to full-growth status. <br /> Salvable Improvements: Carefully remove items indicated to be salvaged, and store on ' <br /> Owner's premises where indicated or directed. <br /> PART 2 - PRODUCTS ' <br /> Not applicable to work of this section. <br /> PART 3 - EXECUTION , <br /> 3.01 SITE CLEARING: <br /> General: Remove trees, shrubs, grass and other ve�etation, improvements, or ' <br /> obstructions interfering with installation of new construction. Remove such items <br /> elsewhere on site or premises as specifically indicated. Removal includes di�Aing out ' <br /> stumps and roots. <br /> Carefully and cleanly cut roots and branches of trees indicated to be left standing, , <br /> where such coots and branches obstruct new construction. <br /> Topsoil: Topsoil is defined as friable clay loam surface soil found in a depth of not less <br /> xhan 4". Satisfactory topsoil is reasonably free of subsoil, clay lumps, stones, and other ' <br /> objects over 2" in diameter, and without weeds, roots, and other objectionable material. <br /> Strip topsoil to whatever depths encountered in a manner to prevent intermingling <br /> with underlying subsoil or other objectionable material. ' <br /> Remove heavy growths of grass from areas before strippin�. <br /> Where trees are indicated to be left standing, stop topsoil strippinR a sufficient , <br /> distance to prevent damage to main root system. <br /> Stockpile topsoil in stora�e piles in areas shown, or where directed. Construct storaqe ' <br /> piles to freely drain surface water. Cover sto�aRe piles if required to p�event wind- <br /> blown dust. <br /> Clearint� and Grubbin�: Clear site of trees, shrubs and other vegetation, except for those ' <br /> indicated to be left standing. <br /> , <br /> SITE CLEARING 02110 - 2 <br /> ' <br /> � ' <br />