My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Garden development project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Garden development project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:18:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hennepin Parks ' <br /> Project BABX-91-589 <br /> December 19, 1991 , <br /> Page 4 <br /> � ' <br /> ' <br /> C. Preliminary Analysis and Recommendations <br /> tion � <br /> C.1 Proposed Construc <br /> We understand the proposed construction will consist of a one-story visitors center as well as <br /> paved parking and drive areas. At this time, the type of construction, floor grade and building ' <br /> loads are unknown. For this report, we have assumed column loads to be less than 50 kips <br /> and wall loads to be less than 3 kips per lineal foot. We have also assumed a floor grade of � <br /> 942.0 feet. Once actual loads and tloor grades have been finalized, a review of this report <br /> should be made by us to determine ir the recommendations contained herein need to be ' <br /> revised. <br /> C.2 Building Pad Preparation ' <br /> We recommend the topsoil and the upper clay layer be removed from within the building <br /> area. The estimated excavation depth at each boring location is about 2 feet. Variations will , <br /> likely occur between the borings which will not be evident until the excavation is underway. <br /> If areas of the building require fill below proposed footing grades, we recommend the <br /> excavation of topsoil be oversized to provide lateral stability to the fill. The bottom of the ' <br /> excavation should be oversized 1 foot beyond the o.utside edge of the footings for each foot of <br /> depth below the bottom of the footing (a 1:1 slope). ' <br /> We recommend the bottom of the excavation be observed by our soils engineer or an assistant <br /> to evaluate the completeness of the topsoil removal and the suitability of the soils left inplace. ' <br /> This must be cione prior to the placement of fill. <br /> In the area of Boring ST-7, wz recommand the loose silty sand be surface compacted to , <br /> increase its inplace relative densitv. Given the soil's classification and moisture content, there <br /> is, however, a small risk the surface compaction will result in the sands becoming unstable. If , <br /> this occurs, a limited subcut of the silty sand may be needed. <br /> With suitable soils exposed, we recommend the bottom of the excavation be surface , <br /> compacted by several passes of a large drum, self:propelled compactor. This will further <br /> densify the upper natural sands. The excavation can then be backfilled with controlle� fill ' <br /> using loose lifts not exceeding 12 inches and compacted by a large drum, self-propelled <br /> compactor. The moisture content of the fill should be within three percentage points of , <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.