Laserfiche WebLink
' <br /> B. THE CONTRACTOR SHALL NOT ALLOW RUBBISH OR WASTE MATERIAL TO , <br /> ACCUMULATE ON OR ABOUT THE PREMISES. AT THE COMPLETION OF THE WORK HE SHALL <br /> PROMPTLY REMOVE ALL RUBBISH AND WASTE MATERIAL AND LEAVE THE BUILDING BROOM , <br /> CLEAN AND READY FOR USE. HE SHALL LEAVE ADJOINING PROPERTI� CLEANED OF REFUSE <br /> AND REPAIR TO THE SATISFACTION OF THE ARCHITECT. THE CONTRACTOR SHALL PROTECT <br /> EXISTING FEATURES AND ELEMENTS WHICH ARE TO REMAIN. HE SHALL RESTORE OR , <br /> REPLACE, AT HIS OWN EXPENSE, ALL DAMAGE TO SAME. <br /> 6. EXISTING UTILITY LINE AND SERVICES <br /> A. IF ACTIVE UTILITY LINES OR SERVICES ARE ENCOUNTERED IN THE V�RK, THEY I <br /> SHALL BE PROPERLY PROTECTED, BRACED AND SUPPORTED AS REQUIRED FOR THE PROPER <br /> PROGRESS AND EXECUTION OF THE WORK. IF EXISTING ACTIVE UTILITY LINES OR ' <br /> SERVICES ARE ENCOUNTERED THAT REQUIRE RELOCATION TO PROPERLY PERFORM THE WORK, <br /> NOTIFY THE ARCHITECT FOR A DETERMINATION. CONTRACTOR SHALL NOT PROCEED WITH <br /> THE WORK UNTIL WRITTEN DIRECTIONS ARE RECEIVED. CONTRACTOR SHALL NOT PREVENT , <br /> OR DISTURB THE OPERATION OF ACTIVE UTILITY LINES AND SERVICES THAT ARE TO <br /> REMAIN. <br /> 7. PROGRESS OF WORK , <br /> A. A SUFFICIENT NUMBER OF C�IPETENT PERSONNEL SHALL BE CONTINUALLY <br /> EMPLOYED BY THE CONTRACTOR AND SUBCONTRACTORS TO SATISFY THE OWNER AND THE ' <br /> ARCHITECT THAT THE I�RK WILL BE Ca+IPLETED BY THE TIME SPECIFIED, OR IN SUCH <br /> TIME AS NOT TO DELAY THE WORK OF OTHERS. <br /> 8. OUALITY OF MATERIALS AND WORK ' <br /> A. ALL WORK DESCRIBED IN THESE SPECIFIC�TIONS OR SHOWN ON THE DRAWINGS, <br /> AND ALL WORK NECESSARY TO THE COMPLETE FINISH OF THE WORK AS DESCRIBED OR , <br /> SHOWN IS TO BE EXECUTED IN A THOROUGHLY SUBSTANTIAL AND WORKMANLIKE MANNER. <br /> B. ALL WORK, FIXTURES, MATERIALS, EQUIPMENT AND APPARATUS SHALL BE NEW ' <br /> AND SHALL BE FIRST CLASS IN EVERY RESPECT, AND ALL SHALL BE DELIVERED UPON THE <br /> COMPLETION OF THE WORK IN A PERFECT AND UNDAMAGED CONDITION WITHOUT EXCEPTION. <br /> C. ALL WORK SHALL BE DONE BY PERSONNEL WHO ARE THOROUGHLY EXPERIENCED IN � <br /> THEIR PARTICULAR TRADE OR CRAFT. <br /> 9. USE AND OCCUPANCY ' <br /> A. USE AND OCCUPANCY OF THE PROJECT BY THE OWNER PRIOR TO FORMAL <br /> ACCEPTANCE OF THE WORK, IF AGREED UPON BETWEEN THE OWNER AND CONTRACTOR, QOES , <br /> NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO MAINTAIN INSURANCE AS <br /> NEREINBEFORE SPECIFIED ON A 100X BASIS FOR THE BENEFIT OF THE OWNER, AND ALL <br /> OTHERS HEREINBEFORE SPECIFIED UNTIL THE PROJECT IS COMPLETED AND ACCEPTED BY <br /> THE OWNER, AND CONTRACTOR HAS RECEIVED THE FINAL PAYMENT. , <br /> 10. COMPLETION DATE <br /> A. SEE INSTRUCTIONS TO BIDDERS, 8. COMMENCEMENT AND COMPLETION OF THE ' <br /> WORK. <br /> ' <br /> SPECIAL CONDITIONS � <br /> . PAGE 2 OF 3 <br />