My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Garden development project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Garden development project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:18:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> � At elbow bends provide metered joints. <br /> Form simple and compound curves by bendin� pipe in jigs to produce uniform <br /> � � curvature for each repetitive confi�uration required; maintain cylindrical cross- <br /> section of pipe throughout entire bend without buckling, twisting or othecwise <br /> deforming exposed surfaces of piQe. <br /> ' <br /> , <br /> ' <br /> ' Hrackets, Flant�es, Fittin�s and Anchocs: Provide wall brackets, end closures, � <br /> flanges, miscellaneous fittin�s and anchors for interconnection of pipe and attach- <br /> ' ment of railings and handrails to other work. Furnish inserts and other anchoraRe <br /> devices for connecting railings and handrails to concrete or masonry work. <br /> For railin� posts set in concrete provide sleeves of galvanized steel pipe not <br /> ' less than 6" lon� and with an inside diameter not less than 1/2" greater than <br /> the outside diameter of pipe. Provide steel plate closure welded to bottom of <br /> sleeve and of width and length not less than 1" greater than outside diameter <br /> , of sleeve. <br /> ' <br /> ' <br /> PART 3 - EXECUTION <br /> I3.01 PREPARATION: <br /> ' Field A4easurements: Take field measurements prior to preparation of shop <br /> drawings and fabrication, where possible. Do not delay job progress; allow for <br /> trimming and fitting where taking field measurements before fabrication mi�ht <br /> delay work. <br /> ' Coordinate and furnish anchorages, settinR drawin s dia rams tem <br /> K � g , plates, <br /> instructions, and directions for installation of anchorages, such as concrete inserts, <br /> , � <br /> �tETAL FABRICATIONS OSS00 - � <br /> � <br /> , ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.