My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Garden development project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Garden development project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:18:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> Store cementitious materials vff the ground,under cover and in dry location. ' <br /> Store agg�e�ates where grading and other required chazacteristics can be maintained. <br /> Store masonry accessories including metal items to prevent deterioration by conosion and , <br /> accumulation of dirt. � ' <br /> 1.Q6 PROJECT CONDITIONS: <br /> � � <br /> Protection of Work: During erection, cover top of walls with heavy waterproof sheeting at end of , <br /> each days' work. Cover partially completed structures when work is not in progress. � <br /> �atend cover a minimum of 24 inches down both sides and hold cover securely in place. <br /> Do not avnlv concentrated loads for at least 3 days after building masonry walls or columns. , <br /> StauunQ;. Prevent grout or mortar or soil &om staining the face of masonry to be left eaposed or , <br /> painted. Remove immediately grout or mortaz in contact with such masonry. <br /> Protect base of walls from rain-splashed mud and mortaz splatter by means of coverings spread on <br /> ground and over wall surface. , <br /> rotect sills,ledges and projections from droppings of mortar. <br /> Cold Weather Protection: ' <br /> Do not lav masonry units which aze wet or frozen. <br /> an ice or snow formed on maso bed b carefull 1 in heat until t surface is , <br /> Remove Y �Y Y Y aPP Y S �P �Y <br /> to the touch. <br /> Remove all masonry detemiined to be damaged by fieezing conditions. � <br /> Provide enclosures and auxiliazy vent to maintain an air temperature of at least 40°F for 24 hours ' <br /> after laying units. <br /> PART 2 -PRODUCTS ' <br /> �.01 BRICK <br /> General: Comply with referenced standards and other requirements indicated below applicable to ' <br /> each form of brick required. <br /> � Provide bricks manufactured to the following actual dimensions: , <br /> �ull Modulaz: 2-1/4" x 3-5/8" x 7-5/8" <br /> Brick Grade: SW Grade in accordance with ASTM C 216. ' <br /> �om�ressive Stre�,gth: 8,000 psi, average,per ASTM C 67 <br /> Co1or: Driftwood color brick pavers as manufactured by the Denver Brick Company or t <br /> equal. <br /> � SECTION 04200-LJr1IT MASONRY , <br /> PAGE 2 OF 6 <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.