My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Garden development project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Garden development project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:18:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> .�f?er `loating, be�in f;rst trowe! finish ooeration usin� a power-driven trowel. 3e�in � <br /> final trowe ling w hen surface p�oduces a ringing sound as trowel is moved over surface. <br /> Consolidate concrete surface by final hand-trowelin� operation, free of trowe! marks, ' <br /> uniform in texture and appearance, and with a surface a level sucface plane so that <br /> despression between high spots do not exceed 1/2" under a 10' straiqhtedge. Grind � <br /> smooth surface defects which would telegraph through applied floor covering system. , <br /> � 3.0� CONCRETE CURING AND PROTECTION: <br /> General: Protect freshly placed concrete from premature drying and excessive cold or , <br /> hot temperatures. <br /> Start initial curing as soon as free water has disappeaced fcom concrete surface after , <br /> placing and finishing. Weather permitting, keep continuously moist for not less than 7 <br /> days. <br /> Begin final curing procedures immediately following initial curing and before concrete ' <br /> has dried. Continue final curing for at least 7 days in accordance with ACI 301 <br /> procedures. Avoid rapid drying at end of final curing period. , <br /> Curin� Methods: Perform Euring of concrete by curing and seallnR compound, by moist <br /> curing, by moisture-retaining cover curing, and by combinations thereof, as herein <br /> specified. � <br /> Provide moisture-cover curinAs as follows. <br /> � <br /> Cover concrete surfaces with moistuce-retaining cover for curing concrete, placed <br /> in widest practicable width with sides and ends lapped at least 3" and sealed by <br /> waterproof tape or adhesive. Im mediately repair any holes or tears durins curing � <br /> period using cover material and waterp�oof tape. <br /> ' <br /> 3.08 REMOVAL OF FORMS: � <br /> Form facinR material may be removed 4 days after placement, only if shores and other <br /> vertical supports have been arranged to permit removal of form facinR material without � <br /> loosening or disturbinR shores and supports. <br /> ' <br /> � <br /> � <br /> � CONCRETE WORK 03310 - 10 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.