Laserfiche WebLink
' <br /> ' <br /> 1 Contraction joints in unexposed floor siabs may be formed by saw cuts as soon as <br /> possible after slab finishing as may be safely done without dislodping aq�regate. <br /> , Joint sealant material is specified in Division 7 sections of these specifications. <br /> ' <br /> ' <br /> , • <br /> � . <br /> ' <br /> 1 <br /> 1 <br /> I3.05 CONCRETE PLACEMENT: . <br /> Preplacement Inspection: Before placing concrete, inspect and complete formwork <br /> ' installation, reinforcing steel, and items to be embedded or cast-in. Notify other crafts <br /> to permit installation_ of their work; cooperate with other trades in setting such work. <br /> Moisten wood forms immediately before placing concrete where form coatings are not <br /> used. <br /> � General: Comply with ACI 304 "Recommended Practice for Measurin , Mixin . <br /> Trans ortin and Placin Concrete and as herein � g' <br /> p g� g "� specified. <br /> � Deposit concrete continuously or in layers of such thickness that no concrete will be <br /> placed on concrete which has hardened sufficiently to cause the formation of seams or <br /> planes of weakness. If a section cannot be placed continuously, p�ovide construction <br /> , joints as herein specified. Deposit concrete as nearly as practicable to its final location <br /> to avoid segregation. <br /> I � <br /> CONCRETE WORK 03310 -7 <br /> � . <br /> � <br />