My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parking lot project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Parking lot project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:29 PM
Creation date
10/16/2017 3:08:08 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,` Hennepin Parks <br /> Project BABX-91-589 <br /> � December 19, 1991 <br /> Page 9 <br /> ' <br /> ' The ower au er borin s were taken with the same e ui ment in en r <br /> P g g q p g e al accordance wrth <br /> ASTM D 1452, "Soil Investigation and Sampling by Auger Borings." The soil classifications <br /> ' and strata depths were infened from the cuttings brought to the surface by rotation of the <br /> auger. Samples of the auger cuttings were then seale� in a glass jaz. <br /> ' E.2 Soil Classification <br /> , Soils encountered in the borings were visually and manually classified in the field by the crew <br /> chief in accordance with ASTM D 2487, "Classification of Soils for Engineering Purposes," <br /> and ASTM D 2488, "Description and Identification of Soils (Visual-Manual Procedures)." A <br /> ' summary of ASTM D 2487 is attached. All samples were then retumed to our laboratory for <br /> review of the field classifications by a soils engineer. Representative samples will remain in <br /> ' our Minneapolis o�ce for a period of 60 days to be available for your examination. <br /> E.3 Groundwater Observations <br /> ' Immediately after taking the final samples in the bottoms of the standard penetration test <br /> borings, the holes were probed through the hollow-stem auger to check for the presence of <br /> ' groundwater. Immediately after withdrawal of the auger, the holes were again probed and the <br /> depths to water or cave-ins were noted. The borings were rechecked and backfilled just prior <br /> to leaving the site. <br /> 1 <br /> In the power auger borings, the bore holes were probed after withdrawal of the auger and the <br /> ' depths to water or cave-in were noted. The borings were rechecked and bacicfilled just prior <br /> to leaving the site. <br /> ' <br /> F. General Recommendations <br /> ' F.1 Basis of Recommendations <br /> The analyses and recommendations submitted in this report are based upon the data obtained <br /> , , from the soil borings performed at the locations indicated on the attached sketch. Vaziations <br /> occur between these borings, the nature and extent of which will not become evident until <br /> ' additionai exploration or construction is conducted. A reevaluation of the recommendations of <br /> this report should be made after performing on-site observations during construction and <br /> ' � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.