Laserfiche WebLink
' <br /> VI. PROJECT SITE , <br /> A. USE OF THE PROJECT SITE <br /> THE CONTRACTOR SHALL NOT UNREASONABLY ENCUMBER THE SITE WITH HIS ' <br /> MATERIALS OR EQUIPMENT AND SHALL CONFINE HIS OPERATIONS AS DIRECTED <br /> BY THE CONSULTANT AND THE PARK DISTRICT AND BY THE CONTRACT <br /> DOCUMENTS. THE CONTRACTOR SHALL NOT EXECUTE THE WORK IN SUCH A ' <br /> MANNER AS WILL, IN THE OPINION OF THE PARK DISTRICT, HINDER, <br /> INTERFERE WITH, MOLEST OR.DELAY THE PROSECUTION OF THE WORK, THE <br /> OPERATION OF THE PARK DISTRICT AT THE SITE, OR THE WORK OF ANY ' <br /> OTHER CONTRACTOR EMPLOYED BY THE PARK DISTRICT. . <br /> B. DISPOtAL OF MATERIALS AND DEBRIS AND CLEAN-UP � � <br /> 1 . THE CONTRACTOR SHALL, PURSUANT TO PARK DISTRICT PROJECT PLANS, I <br /> SPECIFICATIONS AND CONTRACTS KEEP THE PREMISES FREE FROM <br /> ACCUMULATION OF WASTE MATERIAL OR RUBBISH AND ANY DEMOLITION � <br /> DEBRIS CAUSED BY HIS/HER OPERATIONS. ALL MATERIALS AND DEBRIS <br /> SHALL BE REMOVED FROM PARK DISTRICT PROPERTY AND DISPOSED OF AT <br /> AN OFF-SITE "CONSTRUCTION DEBRIS" LAND FILL OR THROUGH OTHER , <br /> APPROVED DISPOSAL CHANNELS AS SPECIFIED BY STATE AND FEDERAL <br /> LAW. <br /> 2: AT THE COMPlETION OF THE WORK AND PRIOR TO RELEASE OF PROJECT ' <br /> FINAL PAYMENT THE CONTRACTOR SHALL REMOVE ALL WASTE MATERIALS, <br /> RUBBISH AND DEBRIS FROM AND ABOVE THE PROJECT, INCLUOING TOOLS, <br /> CONSTRUCTION EQUIPMENT, MACHINERY AND SURPLUS MATERIAtS. AT NO , <br /> TIME WILL ANY CONSTRUCTION OR RECONSTRUCTION DEBRIS/MATERIALS <br /> BE BURIED OR IN ANY OTNER MANNER REMAIN WITHIN THE BOUNDARIES <br /> OF ANY HENNEPIN PARKS PROPERTY. <br /> 3. IF THE CONTRACTOR FAILS TO CLEAN UP AT THE COMPLETION OF THE , <br /> WORK, THE PARK DISTRICT MAY DO SO AND THE (�OST THEREOF SHALL BE <br /> CHARGED TO THE CONTRACTOR AND DEDUCTED FROM THE FINAL PAYMENT. , <br /> IN ADDITION, IF AND WHEN THE PARK DISTRICT'S NASTE DISPOSAL <br /> POLICY IS VIOLATED, HENNEPIN PARKS' ORDINANCE AND/OR FEDEftAL <br /> AND STATE CRIMINAL LAWS WILL BE ENFORCED. , <br /> VII. MATERIALS <br /> A. AW R�Nn ' <br /> THE CONTRACTOR WARRANTS TO THE PARK DISTRICT THAT MATERIALS AND <br /> EQUIPMENT FURNISHED UNDER THE CONTRACT WILL BE MERCHANTABLE AND ' <br /> NEW, THAT THE WORK WILL BE FREE FROM DEFECTS, AND THAT THE WORK <br /> WILL CONFORM WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. <br /> MATERIALS, EQUIPMENT, AND WORK NOT CONFORMING TO THIS WARRANTY , <br /> . SHALL BE CONSIDERED DEFECTIVE. THIS WARRANTY EXCLUDES DAMAGES <br /> CAUSED BY ABUSE, IMPROPER OR INSUFFICIENT MAINTENANCE, OR NORMAL � <br /> WEAR AND TEAR UNDER NORMAL USAGE. <br /> B. CORRECTING DEFECTIVE WORK , <br /> ALL DEFECTIVE MATERIAL, EQUIPMENT OR WORK, WHETHER OBSERVED BEFORE ' <br /> OR AFTER SUBSTANTIAL COMPLETION AND WHETHER OR NOT THEN FABRICATED, <br /> INSTALLED OR COMPIETED, SHALL BE PROMPTLY CORRECTED <br /> GENERAL CONDITIONS , <br /> PAGE 10 OF 14 <br />