My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parking lot project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Parking lot project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:29 PM
Creation date
10/16/2017 3:08:08 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' IV. T <br /> � A• �UBLETTING OF CONTRACT <br /> THE CONTRACTOR SHALL SUBMIT TO THE CONSULTANT HIS LIST OF PROPOSED <br /> ' SUBCONTRACTORS WITH THE SIGNED CONTRACT. <br /> B. SUBCONTRACTORS <br /> ' � THE CONTRACTOR SHALL BE RESPONSIBLE TO THE PARK DISTRICT FOR THE <br /> ACTS AND OMISSIONS OF AlL HIS EMPLOYEES AND ALL SUBCONTRACTORS, <br /> THEIR AGENTS AND EMPLOYEES, AND ALL OTHER PERSONS PERFORMING ANY OF <br /> � THE WORK UNDER A CONTRACT WITH THE CONTRAC�OR. NO SUBCONTRACTOR <br /> WILL BE RECOGNIZED AS SUCH, AND ALL PERSONS ENGAGED IN THE WORK OF <br /> CONSTRUCTION WILL BE CONSIDERED AS EMPLOYEES OF TNE CONTRACTOR AND <br /> � HE WILL BE HELD RESPONSIBLE FOR THEIR WORK, WHICN SHALI BE SUBJECT <br /> TO THE PROVISIONS OF THE CONTRACT. NOTHING CONTAINED IN THE <br /> CONTRACT DOCUMENTS SHALL CREATE ANY CONTRACTUAL RELATIONSHIP <br /> BETWEEN ANY SUBCONTRACTOR AND THE PARK DISTRICT. IT IS FURTHER <br /> , UNDERSTOOD THAT THE PARK DISTRICT WILL HAVE NO DIRECT RELATIONS <br /> WITH ANY SUBCONTRACTOR. ANY NECESSARY RELATIONS BETWEEN THE PARK <br /> D�STRICT AND A SUBCONTRACTOR SHALL BE HANDLED BY THE CONTRACTOR. <br /> IC. 91�dE[3_S RIGHT TO PERFORM WORK AND TO AWARD SEPARATE CONTRACTS. <br /> ' THE OWNER RESERVES THE RIGHT TO PERFORM WORK RELATED TO THE PROJECT <br /> WITH HIS OWN FORCES, AND TO AWARD SEPARATE CONTRACTS IN CONNECTION <br /> WITH OTHER PORTIONS OF THE PROJECT OR OTHER WORK ON THE SITE UNDER <br /> THESE OR SIMILAR CONDITIONS OF THE CONTRACT. IF THE CONTRACTOR <br /> � CLAIMS THAT DELAY OR ADDITIONAL COST IS INVOLVED BECAUSE OF SUCH <br /> ACTION BY THE OWNER, HE SHALL MAKE SUCH CLAIM AS PROVIDED ELSEWHERE <br /> IN THE CONTRACT DOCUMENTS. <br /> ' <br /> V. CONTRACT ENTS <br /> ` � A. ERRORS OR OMISSIONS IN THE CONTRACT DOCUMENTS <br /> 1 . THE CONTRACT DOCUMENTS ARE TO BE THOROUGHLY REVIEWED AND <br /> I EXAMINED BY THE CONTRACTOR AND AN'Y ERROR, INCONSISTENCY OR <br /> �IISSION DISCOVERED AS A RESULT OF THIS REVIEW SHALL BE <br /> REPORTED IN WRITING TO THE PARK DISTRICT. THE REPORTING OF ANY <br /> ' SUCH ERROR, INCONSISTENCY OR OMISSION BY THE CONTRACTOR TO THE <br /> PARK DISTRICT SHALL RELIEVE THE CONTRACTOR OF ANY LIABILITY <br /> RESULTING FROM ANY SUCH ERROR, INCONSISTENCY OR OMISSION. <br /> � PERFORMANCE OF ANY PORTION OF THE WORK WITHOUT CONTRACT <br /> DOCUMENTS AND, WHERE REQUIRED, APPROVED SHOP DRAWINGS, PRODUCT <br /> DATA OR SAMPLES SHALL BE DONE AT THE CONTRACTOR'S SOLE RISK. <br /> � 2. SHOULD THE DRAWINGS DISAGREE IN THEMSELVES OR WITH THE <br /> SPECIFICATIONS, OR SHOULD THE SPECIFICATIONS DISAGREE IN <br /> THEMSELVES, THE BETTER QUALITY AND THE GREATER QUANTITY OF WORK <br /> ' OR MATERIALS SHALL BE FIGURED IN THE PROJECT COST, AND UNLESS <br /> ORDERED OTHERWISE IN WRITING, SHALL BE FURNISHED AND INSTALLED. <br /> , . GENERAL CONDITIONS <br /> PAGE 7 OF 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.