Laserfiche WebLink
' DIVISION 5 <br /> ' ELECTRICAL <br /> SECTION 4 <br /> , STARTERS AND MOTOR CONTROL <br /> � PART 1: GENERAL <br /> 1.01 DESCRIP'I'ION <br /> ' A. Bidding Requirements,Condiaons of the Conuact and pertinent portions of previous Divisions <br /> and Sections of these Specifications apply w the Work of this Section as fully as though repeated <br /> � herein. <br /> B. The Contractor shall furnish and install, complete, motor control centers, starters, control <br /> ' switches,limit switches,etc.as required. All internal buswork and wiring shall be completed by <br /> the manufacturer and where connections must be completed between equipment sections in the <br /> field, the wiring or buswork. shall be terminated in each settion of equipment in a manner to <br /> , facilitate field connections. 'Ihe Contractor shall furnish, properly sized and coordinated, <br /> connectors fa the conductors entering the equipmen� All equipment shall meet the requirements <br /> ' of NEMA standards and the latest edition of the National Electrical Code, where applicable. <br /> 1.02 SUBMITTALS <br /> ' A. The Contractor shall submit complete shop drawings,inswction manuals, and record drawings <br /> to the Engineer for review, approval and forwazding to the Owner. The quandty and general <br /> , format shall be as defined in the General Conditions. The shop drawings and record drawings <br /> shall include: <br /> ' 1. System schematic drawings. <br /> 2. Component schematic drawings. <br /> ' 3. Dimension drawings, wiring and/or piping drawings. <br /> ' 4. Equipment specification sheets. <br /> S. Fabrication and nameplate legend drawings on panels and other enclosures. <br /> ' 6. Com lete motor control center la out,structural, el and ui ment location drawin s. <br /> P Y P� � P 8 <br /> ' 7. Any other information that will assist the Owner in understanding and maintaining the <br /> equipmenG <br /> ' <br /> ' TS-5�-1 <br /> ' <br />