Laserfiche WebLink
' <br /> B. BIDS MUST BE SUBMITTED BY PROPERLY FILLING EACH AND EVERY SPACE PROVIDED , <br /> FOR THAT PURPOSE ON THE PROPOSAL HERETO ATTACHED. BIDS NOT CONFORMING TO <br /> THESE REQUIREMENTS MAY BE REJECTED AS IRREGULAR. <br /> 6. CONTRACTOR'S PERFORMANCE AND PAYMENT BOND• � <br /> A. THE CONTRACTOR SHALL PROMPTLY FURNISH A PERFORMANCE BOND AND LABOR AND ' <br /> MATERIAL PAYMENT BOND IN THE FULL AMOUNT OF THE CONTRACT PRICE IN A FORM <br /> AND WITH SURETIES APPROVED BY THE OWNER. THE BOND SHALL GUARANTEE TO <br /> KEEP ALL WORK CONSTRUCTED UNDER THIS CONTRACT FREE FROM DEFECTS IN <br /> MATERIALS OR I�RKMANSHIP FOR A PERIOD OF ONE YEAR FROM AND AFTER ITS � <br /> COMPLETION BY THE CONTRACTOR AND ITS ACCEPTANCE BY THE OWNER. FOR <br /> CONTRACTS IN AN AhIOIINT LESS THAN s15,000, IN LIEU OF THE BOND, THE <br /> SUCCESSFUL BIDDER MAY PROVIDE AN IRREVOCABLE LETTER OF CREDIT IN THE SAME � <br /> AMOUNT REQUIRED FOR THE BOND AND SUBJECT TO THE SAME CONDITIONS AS THE <br /> BOND. <br /> 7. INFORMATION CONCERNING THE WORK AND THE SITE• � <br /> A. EACH BIDDER SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS AND <br /> FULLY INFORM HIMSELF OF THE NATURE, LOCATION, AND CONDITIONS UNDER WHICH � <br /> THE WORK IS TO BE PERFORMED OR MATERIALS DELIVERED, AND IF AWARDED A <br /> CONTRACT, SHALL NOT BE ALLOWED EXTRA COMPENSATION BECAUSE OF FAILURE TO <br /> HAVE SO INFORMED HIMSELF. BIDDERS SHALL NOT RELY UPON STATEMENTS OR � <br /> REPRESENTATIONS OF OFFICERS OR EMPLOYEES OF THE OWNER WITH REFERENCE TO <br /> THE SITE OR THE CONDITIONS OF THE WORK. <br /> B. THE BIDDER IS INVITED TO VISIT AND INSPECT THE SITE WITH THE PARK RESERVE t <br /> DISTRICT REPRESENTATIVE PRIOR TO THE BID OPENING. <br /> 8. BID SECURITY: � <br /> A. EACH BIDDER MUST SUBMIT BID SECURITY IN THE FORM OF CASH, CERTIFIED CHECK <br /> OR BID BOND PAYABLE TO THE SUBURBAN HENNEPIN REGIONAL PARK DISTRICT IN AN � <br /> At�1NT NOT LESS THAN FIVE PERCENT (5X> OF THE TOTAL BASE BID SUBMITTED. <br /> B. THE BID SECURITY SHALL BE FORFEITED IF THE BIDDER FAILS OR REFUSES TO <br /> ENTER INTO CONTRACT AND FURNISH BOND WITHIN TEN CALENDAR DAYS AFTER HIS , <br /> PROPOSAL SHALL HAVE BEEN ACCEPTED. THIS CLAUSE IN NO WAY SHALL LIMIT THE <br /> OWNERS REMEDIES IN LAW OR IN EQUITY. <br /> C. THE BID SECURITY OF UNSUCCESSFUL BIDDERS WILL BE RETURNED WITHIN 15 DAYS � <br /> AFTER AWARD OF CONTRACT. BID SECURITY OF THE SUCCESSFUL BIDDER WILL BE <br /> RETURNED AFTER HE ENTERS INTO CONTRACT AND FURNISHES SATISFACTORY � <br /> PERFORMANCE BOND. <br /> 9. LAYING OUT THE WORK: <br /> A. ALL CONSTRUCTION STAKING WILL BE PROVIDED BY THE CONTRACTOR. THE � <br /> CONTRACTOR MUST SUPPLY HIS OWN SURVEYING SERVICES TO ACCOMPLISH THE <br /> REQUIRED WORK. OWNER WILL ONLY SUPPLY HORIZONTAL AND VERTICAL CONTROL � <br /> MONUMENTATION AS INDICATED IN THE PLANS. CONTROL MONUMENTATION DESTROYED <br /> BY THE CONTRACTOR'S NEGLECT WILL BE REPLACED AT THE CONTRACTOR'S EXPENSE. <br /> , ' <br /> INSTRUCTIONS TO BIDDERS <br /> PAGE 2 OF 5 � <br />